Cite

APA Citation

    Zhao, F., Bao, H., Wang, L., Xu, T., Zhu, N., & Jonrinaldi,  (2022). a heuristic and meta-heuristic based on problem-specific knowledge for distributed blocking flow-shop scheduling problem with sequence-dependent setup times. Engineering applications of artificial intelligence, 116, . http://access.bl.uk/ark:/81055/vdc_100168600165.0x00002d
  
Back to record