A heuristic and meta-heuristic based on problem-specific knowledge for distributed blocking flow-shop scheduling problem with sequence-dependent setup times. (November 2022)
- Record Type:
- Journal Article
- Title:
- A heuristic and meta-heuristic based on problem-specific knowledge for distributed blocking flow-shop scheduling problem with sequence-dependent setup times. (November 2022)
- Main Title:
- A heuristic and meta-heuristic based on problem-specific knowledge for distributed blocking flow-shop scheduling problem with sequence-dependent setup times
- Authors:
- Zhao, Fuqing
Bao, Haizhu
Wang, Ling
Xu, Tianpeng
Zhu, Ningning
Jonrinaldi, - Abstract:
- Abstract: The distributed production scenario with the sequence-dependent setup times (SDST) widely exists in the modern manufacturing system. This paper investigates the distributed blocking flow-shop scheduling problem with sequence-dependent setup times (SDST/DBFSP). Considering the complexity of the distributed scenario and SDSTs, a discrete heuristic and meta-heuristic is proposed by exploring the problem-specific knowledge. First, a knowledge-incorporated construction heuristic is proposed to reduce the blocking times and idle times generated by SDSTs. In the first stage of the meta-heuristic, an insertion-based neighborhood operator of different factories is developed to explore promising regions in the decision space. In the second stage, a local search operator is embedded to enhance the exploitation ability. Additionally, a simulated annealing-like acceptance criterion of the iterated greedy algorithm is employed to keep the diversity of the population. Finally, an insertion operation for critical factories is introduced to further improve the accuracy of the solutions. Moreover, a speedup method for the insertion neighborhood is expanded to reduce the computational complexity of SDST/DBFSP. In the part of the experiment, a deconstruction process is designed to gain insight into the contribution of each component in the proposed meta-heuristic. The proposed meta-heuristic is assessed through comparing with five state-of-the-art algorithms to demonstrate itsAbstract: The distributed production scenario with the sequence-dependent setup times (SDST) widely exists in the modern manufacturing system. This paper investigates the distributed blocking flow-shop scheduling problem with sequence-dependent setup times (SDST/DBFSP). Considering the complexity of the distributed scenario and SDSTs, a discrete heuristic and meta-heuristic is proposed by exploring the problem-specific knowledge. First, a knowledge-incorporated construction heuristic is proposed to reduce the blocking times and idle times generated by SDSTs. In the first stage of the meta-heuristic, an insertion-based neighborhood operator of different factories is developed to explore promising regions in the decision space. In the second stage, a local search operator is embedded to enhance the exploitation ability. Additionally, a simulated annealing-like acceptance criterion of the iterated greedy algorithm is employed to keep the diversity of the population. Finally, an insertion operation for critical factories is introduced to further improve the accuracy of the solutions. Moreover, a speedup method for the insertion neighborhood is expanded to reduce the computational complexity of SDST/DBFSP. In the part of the experiment, a deconstruction process is designed to gain insight into the contribution of each component in the proposed meta-heuristic. The proposed meta-heuristic is assessed through comparing with five state-of-the-art algorithms to demonstrate its effectiveness. The experimental results testified that the proposed meta-heuristic outperforms other algorithms regarding the significance of the SDST/DBFSP. … (more)
- Is Part Of:
- Engineering applications of artificial intelligence. Volume 116(2022)
- Journal:
- Engineering applications of artificial intelligence
- Issue:
- Volume 116(2022)
- Issue Display:
- Volume 116, Issue 2022 (2022)
- Year:
- 2022
- Volume:
- 116
- Issue:
- 2022
- Issue Sort Value:
- 2022-0116-2022-0000
- Page Start:
- Page End:
- Publication Date:
- 2022-11
- Subjects:
- Distributed scheduling -- Blocking flow-shop -- Sequence-dependent setup times -- Meta-heuristic -- Heuristic
Engineering -- Data processing -- Periodicals
Artificial intelligence -- Periodicals
Expert systems (Computer science) -- Periodicals
Ingénierie -- Informatique -- Périodiques
Intelligence artificielle -- Périodiques
Systèmes experts (Informatique) -- Périodiques
Artificial intelligence
Engineering -- Data processing
Expert systems (Computer science)
Periodicals
620.00285 - Journal URLs:
- http://www.sciencedirect.com/science/journal/09521976 ↗
http://www.elsevier.com/journals ↗ - DOI:
- 10.1016/j.engappai.2022.105443 ↗
- Languages:
- English
- ISSNs:
- 0952-1976
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 3755.704500
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 24158.xml