Cite
APA Citation
Chrimes, M., & Preene, M. (n.d.). groundwater lowering for construction of the Kilsby Tunnel, UK – pumping and tunnelling. Proceedings of ICE, 175(4), 109–129. http://access.bl.uk/ark:/81055/vdc_100170096241.0x000002
This is an interim version of our Electronic Legal Deposit Catalogue-eJournals and eBooks while we continue to recover from a cyber-attack.
Chrimes, M., & Preene, M. (n.d.). groundwater lowering for construction of the Kilsby Tunnel, UK – pumping and tunnelling. Proceedings of ICE, 175(4), 109–129. http://access.bl.uk/ark:/81055/vdc_100170096241.0x000002