Cite
HARVARD Citation
Jauhari, W. et al. (2018). A vendor–buyer inventory model with imperfect production considering investment to reduce lead time variability. Cogent engineering. 5 (1), p. . [Online].
This is an interim version of our Electronic Legal Deposit Catalogue-eJournals and eBooks while we continue to recover from a cyber-attack.
Jauhari, W. et al. (2018). A vendor–buyer inventory model with imperfect production considering investment to reduce lead time variability. Cogent engineering. 5 (1), p. . [Online].