A vendor–buyer inventory model with imperfect production considering investment to reduce lead time variability. Issue 1 (1st January 2018)
- Record Type:
- Journal Article
- Title:
- A vendor–buyer inventory model with imperfect production considering investment to reduce lead time variability. Issue 1 (1st January 2018)
- Main Title:
- A vendor–buyer inventory model with imperfect production considering investment to reduce lead time variability
- Authors:
- Jauhari, Wakhid Ahmad
Sianipar, Mariana
Rosyidi, Cucuk Nur
Dwicahyani, Anindya Rachma - Editors:
- Peng, Tao
- Abstract:
- Abstract: This research develops an integrated single-vendor single-buyer inventory model considering imperfect production process and investment to reduce lead time variance. In the model, we consider a system where the buyer's lead time is uncertain and follows a normal distribution. Inspection process is performed by the buyer to classify the defective items in each lot delivered from the vendor. The defective items that were found by the buyer will be returned to the vendor at the next delivery. The shortages are allowed and assumed to be fully backordered. The objective function of the model is to minimize the expected joint total cost of the system by simultaneously determining the optimal shipment lot size, optimal safety factor, optimal target variance reduction of lead time and optimal number of shipments. Further, a numerical example is provided to illustrate the application of the proposed model. Based on the results, we understand that by applying the investment policy to reduce lead time variance, the system may improve its service level at a lower cost. Thus, we conclude that the investment policy is proved to give better outcomes to the system.
- Is Part Of:
- Cogent engineering. Volume 5:Issue 1(2018)
- Journal:
- Cogent engineering
- Issue:
- Volume 5:Issue 1(2018)
- Issue Display:
- Volume 5, Issue 1 (2018)
- Year:
- 2018
- Volume:
- 5
- Issue:
- 1
- Issue Sort Value:
- 2018-0005-0001-0000
- Page Start:
- Page End:
- Publication Date:
- 2018-01-01
- Subjects:
- inventory model -- lot sizing -- supply chain system -- lead time variance -- imperfect production -- shortage -- full backorder
Engineering -- Periodicals
Technology -- Periodicals
Engineering
Technology
Periodicals
620 - Journal URLs:
- http://bibpurl.oclc.org/web/73324 ↗
http://cogentoa.tandfonline.com/journal/oaen20 ↗
http://www.tandfonline.com/toc/oaen20/1/1 ↗
http://www.tandfonline.com/ ↗
http://cogentoa.tandfonline.com/journal/oaps20 ↗ - DOI:
- 10.1080/23311916.2018.1531455 ↗
- Languages:
- English
- ISSNs:
- 2331-1916
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 21686.xml