The impact of public–private partnerships for roadway projects on traffic safety: An exploratory empirical analysis of crash frequencies. (March 2022)
- Record Type:
- Journal Article
- Title:
- The impact of public–private partnerships for roadway projects on traffic safety: An exploratory empirical analysis of crash frequencies. (March 2022)
- Main Title:
- The impact of public–private partnerships for roadway projects on traffic safety: An exploratory empirical analysis of crash frequencies
- Authors:
- Sonduru Pantangi, Sarvani
Fountas, Grigorios
Tawfiq Sarwar, Md
Bhargava, Abhishek
Mohan, Satish B.
Savolainen, Peter
Ch. Anastasopoulos, Panagiotis - Abstract:
- Highlights: The safety performance of Public–Private Partnerships (PPP) in roadway projects is examined. Crash frequencies are modeled with correlated random parameter count data approaches. Heterogeneity in the means of random parameters is also considered. Factors affecting crash frequencies are found to vary across PPP contract types. Higher cost, shorter duration, and smaller size of the contract are found to reduce crashes. Abstract: Since the mid-2000s, Public–Private Partnerships (PPP) have been established in transportation infrastructure projects as an effective alternative to the traditional procurement process, such as design-bid-build where the design and construction are awarded separately and sequentially to private firms. PPP contracts ensure both greater participation of the private sector, as well as shared responsibility in project delivery. However, the interrelationship between various PPP approaches and the status of traffic safety during the project implementation has not been thoroughly explored to date. This paper seeks to provide new insights into the performance of different PPP contracting approaches by investigating them from the perspective of transportation safety. To that end, a statistical analysis is conducted in order to distinguish differences with respect to the characteristics of crashes that occurred during the contractual period of roadway projects. Using data from 645 PPP contracts that were executed across multiple States of the USHighlights: The safety performance of Public–Private Partnerships (PPP) in roadway projects is examined. Crash frequencies are modeled with correlated random parameter count data approaches. Heterogeneity in the means of random parameters is also considered. Factors affecting crash frequencies are found to vary across PPP contract types. Higher cost, shorter duration, and smaller size of the contract are found to reduce crashes. Abstract: Since the mid-2000s, Public–Private Partnerships (PPP) have been established in transportation infrastructure projects as an effective alternative to the traditional procurement process, such as design-bid-build where the design and construction are awarded separately and sequentially to private firms. PPP contracts ensure both greater participation of the private sector, as well as shared responsibility in project delivery. However, the interrelationship between various PPP approaches and the status of traffic safety during the project implementation has not been thoroughly explored to date. This paper seeks to provide new insights into the performance of different PPP contracting approaches by investigating them from the perspective of transportation safety. To that end, a statistical analysis is conducted in order to distinguish differences with respect to the characteristics of crashes that occurred during the contractual period of roadway projects. Using data from 645 PPP contracts that were executed across multiple States of the US between 1996 and 2011, count data models of crash frequencies are developed. To take into account the effect of unobserved factors on crash frequencies, correlated random parameter models with heterogeneity in the means are estimated. The results of the statistical analysis overall show that the determinants of crash frequencies and the magnitude of their impacts vary across PPP types. Contracts with higher cost, shorter duration, fewer lane-miles to be covered, more asset work activities, as well as contracts for roadways featuring better pavement and drainage conditions, low to medium AADT, and higher width of shoulder are more likely to observe fewer crashes. Additionally, several variables resulted in correlated random parameters (such as, contract size in lane-miles and truck percentage), with their distributional characteristics being affected by other exogenous factors (such as pavement characteristics), thus unveiling the heterogeneous patterns underpinning the safety performance of different PPP approaches. … (more)
- Is Part Of:
- Analytic methods in accident research. Volume 33(2022)
- Journal:
- Analytic methods in accident research
- Issue:
- Volume 33(2022)
- Issue Display:
- Volume 33, Issue 2022 (2022)
- Year:
- 2022
- Volume:
- 33
- Issue:
- 2022
- Issue Sort Value:
- 2022-0033-2022-0000
- Page Start:
- Page End:
- Publication Date:
- 2022-03
- Subjects:
- Public–Private Partnerships -- Crash frequency -- Negative binomial -- Poisson -- Correlated random parameters -- Unobserved heterogeneity
Accidents -- Research -- Methodology -- Periodicals
Accidents -- Prevention -- Periodicals
363.100721 - Journal URLs:
- http://www.sciencedirect.com/science/journal/22136657 ↗
http://www.sciencedirect.com/ ↗ - DOI:
- 10.1016/j.amar.2021.100192 ↗
- Languages:
- English
- ISSNs:
- 2213-6657
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 20488.xml