Cite

APA Citation

    Laha, D., & Gupta, J. N. (2016). a Hungarian penalty-based construction algorithm to minimize makespan and total flow time in no-wait flow shops. Computers & industrial engineering, 98, 373–383. http://access.bl.uk/ark:/81055/vdc_100034881046.0x000005
  
Back to record