Cite

APA Citation

    Zeng, Z., Hong, M., Man, Y., Li, J., Zhang, Y., & Liu, H. (2018). multi-object optimization of flexible flow shop scheduling with batch process — Consideration total electricity consumption and material wastage. Journal of cleaner production, 183, 925–939. http://access.bl.uk/ark:/81055/vdc_100058430260.0x000035
  
Back to record