Cite
APA Citation
Chen, X., Wang, Z., Pesch, E., Sterna, M., & Błażewicz, J. (2019). two-machine flow-shop scheduling to minimize total late work: revisited. Engineering optimization, 51(7), 1268–1278. http://access.bl.uk/ark:/81055/vdc_100082273060.0x000048