Cite
APA Citation
Jin, F., Zhao, J., Han, Z., & Wang, W. (2018). a joint scheduling method for multiple byproduct gases in steel industry. Control engineering practice, 80, 174–184. http://access.bl.uk/ark:/81055/vdc_100068920341.0x000019
This is an interim version of our Electronic Legal Deposit Catalogue-eJournals and eBooks while we continue to recover from a cyber-attack.
Jin, F., Zhao, J., Han, Z., & Wang, W. (2018). a joint scheduling method for multiple byproduct gases in steel industry. Control engineering practice, 80, 174–184. http://access.bl.uk/ark:/81055/vdc_100068920341.0x000019