Cite
APA Citation
Şahin, M., & Kellegöz, T. (2017). increasing production rate in U-type assembly lines with sequence-dependent set-up times. Engineering optimization, 49(8), 1401–1419. http://access.bl.uk/ark:/81055/vdc_100046565523.0x000064
This is an interim version of our Electronic Legal Deposit Catalogue-eJournals and eBooks while we continue to recover from a cyber-attack.
Şahin, M., & Kellegöz, T. (2017). increasing production rate in U-type assembly lines with sequence-dependent set-up times. Engineering optimization, 49(8), 1401–1419. http://access.bl.uk/ark:/81055/vdc_100046565523.0x000064