Cite
MLA Citation
Gerard Mignone et al.. “Enhancing collaboration in BIM-based construction networks through organisational discontinuity theory: a case study of the new Royal Adelaide Hospital.” Architectural engineering and design management, vol. 12, 2016, pp. 333–352. http://access.bl.uk/ark:/81055/vdc_100034566301.0x00001a