Cite

MLA Citation

    Jun-Xi Zheng et al.. “The high performing backtracking algorithm and heuristic for the sequence-dependent setup times flowshop problem with total weighted tardiness.” Engineering optimization, vol. 48, no. 9, 2016, pp. 1571–1592. http://access.bl.uk/ark:/81055/vdc_100033805988.0x00004a
  
Back to record