1. A Bi-objective optimization model for the last train timetabling problem. (September 2022) Authors: Ning, Jia; Peng, Qiyuan; Zhu, Yongqiu; Jiang, Yu; Nielsen, Otto Anker Journal: Journal of rail transport planning & management Issue: Volume 23(2022) Page Start: Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
2. A bilevel programming model for operative decisions on special trains: An Indian Railways perspective. Issue 3 (December 2018) Authors: Kumar, Akhilesh; Gupta, Anjana; Mehra, Aparna Journal: Journal of rail transport planning & management Issue: Volume 8:Issue 3/4(2018) Page Start: 184 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
3. A concurrent approach to the periodic event scheduling problem. (September 2020) Authors: Borndörfer, Ralf; Lindner, Niels; Roth, Sarah Journal: Journal of rail transport planning & management Issue: Volume 15(2020) Page Start: Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
4. A detailed analysis of the actual impact of real-time railway traffic management optimization. Issue 1 (June 2016) Authors: Pellegrini, Paola; Marlière, Grégory; Rodriguez, Joaquin Journal: Journal of rail transport planning & management Issue: Volume 6:Issue 1(2016) Page Start: 13 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
5. A disaggregate bundle method for train timetabling problems. (December 2020) Authors: Ait-Ali, Abderrahman; Lindberg, Per Olov; Eliasson, Jonas; Nilsson, Jan-Eric; Peterson, Anders Journal: Journal of rail transport planning & management Issue: Volume 16(2020) Page Start: Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
6. A dynamic model for real-time track assignment at railway yards. (June 2020) Authors: Schasfoort, B.B.W.; Gkiotsalitis, K.; Eikenbroek, O.A.L.; van Berkum, E.C. Journal: Journal of rail transport planning & management Issue: Volume 14(2020) Page Start: Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
7. A genetic algorithm for heterogeneous high-speed railway timetabling with dense traffic: The train-sequence matrix encoding scheme. (September 2022) Authors: Yao, Zhiyuan; Nie, Lei; He, Zhenhuan Journal: Journal of rail transport planning & management Issue: Volume 23(2022) Page Start: Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
8. A matheuristic method for planning railway freight transportation with hazardous materials. (August 2019) Authors: Abuobidalla, Omar; Chen, Mingyuan; Chauhan, Satyaveer Journal: Journal of rail transport planning & management Issue: Volume 10(2019) Page Start: 46 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
9. A methodology for the design of sections block length on ETCS L2 railway networks. (May 2020) Authors: Vignali, Valeria; Cuppi, Federico; Lantieri, Claudio; Dimola, Nicola; Galasso, Tomaso; Rapagnà, Luca Journal: Journal of rail transport planning & management Issue: Volume 13(2020) Page Start: Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
10. A methodology to optimise a rail network specification for maximum passenger satisfaction and reduced initial investment. (March 2022) Authors: Hickish, Bob; Fletcher, David I.; Harrison, Robert F. Journal: Journal of rail transport planning & management Issue: Volume 21(2022) Page Start: Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗