Search
Search Constraints
You searched for: Journal Ocean engineeringLimit your search
- Journal Article10,242
- Ocean engineering [remove]10,242
- Guedes Soares, C. 189
- Zhang, Wei 48
- Atlar, Mehmet 45
- Incecik, Atilla 44
- Li, Xin 43
- Zhang, Weidong 40
- Pan, Guang 39
- Tang, Wenyong 38
- Dong, Sheng 37
- Zhang, Xianku 35
- 620.4162 10,242
- Ocean engineering 10,242
- Ocean engineering -- Periodicals 10,242
- Periodicals 10,242
- 00-01 -- 99-00 8
- Bubble sweep-down -- Experimental trials -- Ship motions -- Bow waves 4
- AC air conditioning -- CFD Computational Fluid Dynamics -- COP coefficient of performance -- CWS chilled water system -- ECA emission control area -- EEDI energy efficiency design index -- EGB exhaust gas boiler -- EGC exhaust gas cleaning -- HFO heavy fuel oil -- HT high temperature -- IAS integrated automation system -- IMO International Maritime Organization -- LNG liquefied natural gas -- LSF low sulphur fuel -- LT low temperature -- MDO marine diesel oil -- MGO marine gas oil -- NOx nitrogen oxides -- SEEMP Ship Energy Efficiency Management Plan -- SOx sulphur oxides -- VFD variable frequency drive -- WHRS waste heat recovery system 2
- ADV -- Reynolds stress -- Stress fraction -- Turbulence -- Wave-maker -- Wave-current 2
- AFD accumulated fatigue damage -- CRA corrosion resistance alloy -- DEH direct electrical heating -- DP dynamic positioning -- DPS double pipe solution -- DW deep water -- ETH electrical traced heating -- ECA engineering criticality assessment -- FDS Field Development Ship -- FEM finite element model -- FL firing line -- GoM Gulf of Mexico -- HC holding capacity -- HD holding demand -- Hs significant wave height -- i-DBB inverse Double Block and Bled -- i-HIPPS inverse High Integrity Pressure Protection System -- ILV In-Line Valve -- ILS In-Line Structure -- ISB in-service buckling -- JIP joint industry project -- MBL minimum breaking load -- MWTR minimum wall thickness requirement -- MHCR minimum holding capacity requirement -- OGOI oil & gas offshore industry -- OD outer diameter -- OSCV offshore subsea construction vessel -- PiP pipe in pipe -- PLET pipeline end termination -- PLEM pipeline end manifold -- RTFDA real time accumulated fatigue damage assessment -- RTM real time monitoring -- SAGE South Asia Gas Enterprise -- SCR steel catenary riser -- SAWL submerged arc-welding longitudinal -- SMLS seam lessteel catenary riser -- SNB strain based design -- SS semi-submersible -- SURF structures -- umbilicals risers and flowlines -- SWL safe working load -- UDW ultra-deep water -- TDP touch down point -- TP peak period -- WD water depth -- WT wall thickness 2
- AIR abnormal instrument reading -- AU accumulator unit -- BOP blowout preventer -- BP booster pump -- CS, coarse strainer -- DSV dive support vessel -- ELP external leakage process -- ELU external leakage utility -- FMECA failure mode, effects, and criticality analysis -- FPSO floating production storage and offloading -- FS flow sensor -- Ft filter -- FTA fault tree analysis -- HCU hydraulic coupling unit -- HLS hydrocarbon leak sensor -- hr hours -- HPFC high pressure fluid carrier -- HS hydro-cyclone/skimmer -- IGF induced gas floatation -- ISCU inlet seawater cleaning unit -- MAROS maintainability, availability, reliability and operability simulation -- MTTF mean time to failure, hrs -- MTTR mean time to repair, hrs -- OREDA offshore reliability data -- OSCU outlet seawater cleaning unit -- PD parameter deviation -- PSCU power/signal coupler unit -- PSU power supply unit -- PTS pressure and temperature sensor -- PU piping unit -- r repair time, hrs -- R(t) reliability -- RAM reliability, availability and maintainability -- RBD reliability block diagrams -- SBP subsea booster pump -- SCM subsea control module -- SD structural deficiency -- SDS sand detection sensor -- SEU subsea electronic unit -- SM subsea manifold -- SR subsea riser -- SS subsea separator -- SSBU seabed storage ballast unit -- SST seabed storage tank -- SSTM seabed storage tank module -- SSTU seabed storage tank unit -- SU sensor unit -- TLPs tension leg platforms -- t operation time, hrs -- UF ultra-filtration -- VD vacuum de-aerator -- λ failure rate, failures per 106 h 2