1. The Mecca Clock Tower Project: Structural Design and Construction of a Hybrid Tall Building. Issue 1 (2nd January 2019) Authors: Braun, Frank; Ludescher, Guido Journal: Structural engineering international Issue: Volume 29:Issue 1(2019) Page Start: 167 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗