1. A new hybrid particle swarm optimization and parallel variable neighborhood search algorithm for flexible job shop scheduling with assembly process. Issue 3 (17th January 2020) Authors: Fattahi, Parviz; Bagheri Rad, Naeeme; Daneshamooz, Fatemeh; Ahmadi, Samad Journal: Assembly automation Issue: Volume 40:Issue 3(2020) Page Start: 419 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
2. A new hybrid particle swarm optimization and parallel variable neighborhood search algorithm for flexible job shop scheduling with assembly process. Issue 3 (20th January 2020) Authors: Fattahi, Parviz; Bagheri Rad, Naeeme; Daneshamooz, Fatemeh; Ahmadi, Samad Journal: Assembly automation Issue: Volume 40:Issue 3(2020) Page Start: 419 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
3. An exact method for job sequencing in a mixed-model assembly line considering feeding lines based on the Benders decomposition approach. Issue 2 (3rd April 2022) Authors: Saadi, Anis; Fattahi, Parviz; Rahmanii, Donya; Hosseini, Seyed Mohammad Hassan; Sana, Shib Sankar Journal: International journal of management science and engineering management Issue: Volume 17:Issue 2(2022) Page Start: 79 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
4. Bi-objective reliable multi-product location-inventory problem design with perishable products and freshness-dependent demands. (5th May 2021) Authors: Aghajani, Mohsen; Fattahi, Parviz; Hajipour, Vahid Journal: International journal of industrial and systems engineering Issue: Volume 38:Number 1(2021) Page Start: 107 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
5. Bi-objective vibration damping optimization for congested location–pricing problem. (June 2016) Authors: Hajipour, Vahid; Farahani, Reza Zanjirani; Fattahi, Parviz Journal: Computers & operations research Issue: Volume 70(2016) Page Start: 87 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
6. Mathematical modeling and two efficient branch and bound algorithms for job shop scheduling problem followed by an assembly stage. Issue 12 (22nd January 2021) Authors: Daneshamooz, Fatemeh; Fattahi, Parviz; Hosseini, Seyed Mohammad Hassan Journal: Kybernetes Issue: Volume 50:Issue 12(2021) Page Start: 3222 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
7. Minimizing maximum tardiness on a single machine with family setup times and machine disruption. (May 2021) Authors: Molaee, Ehsan; Sadeghian, Ramin; Fattahi, Parviz Journal: Computers & operations research Issue: Volume 129(2021) Page Start: Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
8. Scheduling in a flexible job shop followed by some parallel assembly stations considering lot streaming. Issue 4 (3rd April 2022) Authors: Daneshamooz, Fatemeh; Fattahi, Parviz; Hosseini, Seyed Mohammad Hassan Journal: Engineering optimization Issue: Volume 54:Issue 4(2022) Page Start: 614 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
9. Stochastic inventory-routing problem with lateral transshipment for perishable product. (3rd June 2021) Authors: Fattahi, Parviz; Tanhatalab, Mehdi Journal: Journal of modelling in management Issue: Volume 17:Number 2(2022) Page Start: 539 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗