A new hybrid particle swarm optimization and parallel variable neighborhood search algorithm for flexible job shop scheduling with assembly process. Issue 3 (17th January 2020)
- Record Type:
- Journal Article
- Title:
- A new hybrid particle swarm optimization and parallel variable neighborhood search algorithm for flexible job shop scheduling with assembly process. Issue 3 (17th January 2020)
- Main Title:
- A new hybrid particle swarm optimization and parallel variable neighborhood search algorithm for flexible job shop scheduling with assembly process
- Authors:
- Fattahi, Parviz
Bagheri Rad, Naeeme
Daneshamooz, Fatemeh
Ahmadi, Samad - Abstract:
- Abstract : Purpose: The purpose of this paper is to present a mathematical model and a new hybrid algorithm for flexible job shop scheduling problem with assembly operations. In this problem, each product is produced by assembling a set of several different parts. At first, the parts are processed in a flexible job shop system, and then at the second stage, the parts are assembled and products are produced. Design/methodology/approach: As the problem is non-deterministic polynomial-time-hard, a new hybrid particle swarm optimization and parallel variable neighborhood search (HPSOPVNS) algorithm is proposed. In this hybrid algorithm, particle swarm optimization (PSO) algorithm is used for global exploration of search space and parallel variable neighborhood search (PVNS) algorithm for local search at vicinity of solutions obtained in each iteration. For parameter tuning of the metaheuristic algorithms, Taguchi approach is used. Also, a statistical test is proposed to compare the ability of metaheuristics at finding the best solution in the medium and large sizes. Findings: Numerical experiments are used to evaluate and validate the performance and effectiveness of HPSOPVNS algorithm with hybrid particle swarm optimization with a variable neighborhood search (HPSOVNS) algorithm, PSO algorithm and hybrid genetic algorithm and Tabu search (HGATS). The computational results show that the HPSOPVNS algorithm achieves better performance than competing algorithms. PracticalAbstract : Purpose: The purpose of this paper is to present a mathematical model and a new hybrid algorithm for flexible job shop scheduling problem with assembly operations. In this problem, each product is produced by assembling a set of several different parts. At first, the parts are processed in a flexible job shop system, and then at the second stage, the parts are assembled and products are produced. Design/methodology/approach: As the problem is non-deterministic polynomial-time-hard, a new hybrid particle swarm optimization and parallel variable neighborhood search (HPSOPVNS) algorithm is proposed. In this hybrid algorithm, particle swarm optimization (PSO) algorithm is used for global exploration of search space and parallel variable neighborhood search (PVNS) algorithm for local search at vicinity of solutions obtained in each iteration. For parameter tuning of the metaheuristic algorithms, Taguchi approach is used. Also, a statistical test is proposed to compare the ability of metaheuristics at finding the best solution in the medium and large sizes. Findings: Numerical experiments are used to evaluate and validate the performance and effectiveness of HPSOPVNS algorithm with hybrid particle swarm optimization with a variable neighborhood search (HPSOVNS) algorithm, PSO algorithm and hybrid genetic algorithm and Tabu search (HGATS). The computational results show that the HPSOPVNS algorithm achieves better performance than competing algorithms. Practical implications: Scheduling of manufacturing parts and planning of assembly operations are two steps in production systems that have been studied independently. However, with regard to many manufacturing industries having assembly lines after manufacturing stage, it is necessary to deal with a combination of these problems that is considered in this paper. Originality/value: This paper proposed a mathematical model and a new hybrid algorithm for flexible job shop scheduling problem with assembly operations. … (more)
- Is Part Of:
- Assembly automation. Volume 40:Issue 3(2020)
- Journal:
- Assembly automation
- Issue:
- Volume 40:Issue 3(2020)
- Issue Display:
- Volume 40, Issue 3 (2020)
- Year:
- 2020
- Volume:
- 40
- Issue:
- 3
- Issue Sort Value:
- 2020-0040-0003-0000
- Page Start:
- 419
- Page End:
- 432
- Publication Date:
- 2020-01-17
- Subjects:
- Scheduling -- Flexible job shop -- Assembly -- Particle swarm optimization (PSO) -- Parallel variable neighborhood search (PVNS) -- Flexible manufacturing -- Assembly sequence planning
Automation -- Periodicals
Automatic machinery -- Periodicals
Assembly-line methods -- Periodicals
Industrial engineering -- Periodicals
670.42705 - Journal URLs:
- http://www.emerald-library.com/0144-5154.htm ↗
http://www.emeraldinsight.com/journals.htm?issn=0144-5154 ↗
http://www.emeraldinsight.com/ ↗
http://firstsearch.oclc.org ↗ - DOI:
- 10.1108/AA-11-2018-0178 ↗
- Languages:
- English
- ISSNs:
- 0144-5154
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 1746.606200
British Library DSC - BLDSS-3PM
British Library STI - ELD Digital store - Ingest File:
- 22157.xml