1. A comparative analysis of embodied carbon in high-rise buildings regarding different design parameters. (10th September 2017) Authors: Gan, Vincent J.L.; Chan, C.M.; Tse, K.T.; Lo, Irene M.C.; Cheng, Jack C.P. Journal: Journal of cleaner production Issue: Volume 161(2017) Page Start: 663 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
2. A comprehensive approach to mitigation of embodied carbon in reinforced concrete buildings. (20th August 2019) Authors: Gan, Vincent J.L.; Cheng, Jack C.P.; Lo, Irene M.C. Journal: Journal of cleaner production Issue: Volume 229(2019) Page Start: 582 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
3. A data-driven study of important climate factors on the achievement of LEED-EB credits. (August 2015) Authors: Cheng, Jack C.P.; Ma, Lucky J. Journal: Building and environment Issue: Volume 90(2015) Page Start: 232 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
4. A financial decision making framework for construction projects based on 5D Building Information Modeling (BIM). Issue 1 (January 2016) Authors: Lu, Qiqi; Won, Jongsung; Cheng, Jack C.P. Journal: International journal of project management Issue: Volume 34:Issue 1(2016) Page Start: 3 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
5. A Lag-FLSTM deep learning network based on Bayesian Optimization for multi-sequential-variant PM2.5 prediction. (September 2020) Authors: Ma, Jun; Ding, Yuexiong; Cheng, Jack C.P.; Jiang, Feifeng; Gan, Vincent J.L.; Xu, Zherui Journal: Sustainable cities and society Issue: Volume 60(2020) Page Start: Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
6. A non-linear case-based reasoning approach for retrieval of similar cases and selection of target credits in LEED projects. (November 2015) Authors: Cheng, Jack C.P.; Ma, Lucky J. Journal: Building and environment Issue: Volume 93:Part 2(2015) Page Start: 349 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
7. A non-linear case-based reasoning approach for retrieval of similar cases and selection of target credits in LEED projects. (November 2015) Authors: Cheng, Jack C.P.; Ma, Lucky J. Journal: Building and environment Issue: Volume 93:Part 2(2015) Page Start: 349 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
8. A novel Data-Driven framework based on BIM and knowledge graph for automatic model auditing and Quantity Take-off. (October 2022) Authors: Liu, Hao; Cheng, Jack C.P.; Gan, Vincent J.L.; Zhou, Shanjing Journal: Advanced engineering informatics Issue: Volume 54(2022) Page Start: Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
9. A temporal-spatial interpolation and extrapolation method based on geographic Long Short-Term Memory neural network for PM2.5. (10th November 2019) Authors: Ma, Jun; Ding, Yuexiong; Cheng, Jack C.P.; Jiang, Feifeng; Wan, Zhiwei Journal: Journal of cleaner production Issue: Volume 237(2019) Page Start: Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗
10. An ontology-based web service framework for construction supply chain collaboration and management. Issue 5 (21st September 2015) Authors: Professor Monty Sutrisna and Professor Mohan M. Kumaraswamy, Associate; Das, Moumita; Cheng, Jack C.P.; Law, Kincho H. Journal: Engineering, construction and architectural management Issue: Volume 22:Issue 5(2015) Page Start: 551 Record Type: Journal Article View Content: Available online (eLD content is only available in our Reading Rooms) ↗