Effects of asymmetric investment cost information on revenue-compensated build-operate-transfer highway contracts. (June 2023)
- Record Type:
- Journal Article
- Title:
- Effects of asymmetric investment cost information on revenue-compensated build-operate-transfer highway contracts. (June 2023)
- Main Title:
- Effects of asymmetric investment cost information on revenue-compensated build-operate-transfer highway contracts
- Authors:
- Lu, Zhaoyang
Meng, Qiang - Abstract:
- Highlights: A principal-agent model is proposed for BOT highway contracts under the effects of asymmetric investment cost information. Properties of these optimal BOT contracts under asymmetric/symmetric cost information are respectively discussed and compared. The extent to which cost information asymmetries influence these contracts is examined. Numerical experiments are conducted to demonstrate our results and findings. Abstract: In the planning stage of build-operate-transfer (BOT) highway projects, private firms usually possess more information about the investment cost than governments. This study considers the problem of how to design project contracts and regulate private firms whose investment costs are unobservable to governments. A principal-agent model is proposed to investigate this type of BOT contracts, in which governments aim to maximize social welfare, while the firms are guaranteed a reserved level of profit and have no incentive to misreport their costs. Besides, the extent to which the information asymmetries influence these contracts is examined, through an analysis of the effects of the distribution of marginal cost parameters and the shadow cost of public funds. Furthermore, properties of these contracts are discussed and compared with the revenue-compensated BOT contracts under symmetric cost information.
- Is Part Of:
- Transportation research. Volume 172(2023)
- Journal:
- Transportation research
- Issue:
- Volume 172(2023)
- Issue Display:
- Volume 172, Issue 2023 (2023)
- Year:
- 2023
- Volume:
- 172
- Issue:
- 2023
- Issue Sort Value:
- 2023-0172-2023-0000
- Page Start:
- 71
- Page End:
- 92
- Publication Date:
- 2023-06
- Subjects:
- Build-operate-transfer -- Highway capacity -- Toll charge -- Government guarantee -- Asymmetric cost information
Transportation -- Research -- Periodicals
Transportation -- Mathematical models -- Periodicals - Journal URLs:
- http://www.elsevier.com/journals ↗
http://www.sciencedirect.com/science/journal/01912615 ↗ - DOI:
- 10.1016/j.trb.2023.03.011 ↗
- Languages:
- English
- ISSNs:
- 0191-2615
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 9026.274610
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 27102.xml