Potential impact on cost-effectiveness estimates of using immature survival data: a case study based on transcatheter edge-to-edge repair (TEER) used for patients with severe mitral regurgitation at high surgical risk. Issue 3 (14th March 2023)
- Record Type:
- Journal Article
- Title:
- Potential impact on cost-effectiveness estimates of using immature survival data: a case study based on transcatheter edge-to-edge repair (TEER) used for patients with severe mitral regurgitation at high surgical risk. Issue 3 (14th March 2023)
- Main Title:
- Potential impact on cost-effectiveness estimates of using immature survival data: a case study based on transcatheter edge-to-edge repair (TEER) used for patients with severe mitral regurgitation at high surgical risk
- Authors:
- Connock, Martin
Auguste, Peter
Capelle, Aude
Hénaine, Anna-Maria
Obadia, Jean-François
Armoiry, Xavier - Abstract:
- Abstract : Objective: To review the survival modelling used in cost-effectiveness studies evaluating an interventional procedure and to discuss implications for decision-makers. Design: A case study of three economic evaluations that each used immature data from the EVEREST II High Surgical Risk (HSR) Study of transcatheter edge-to-edge repair (TEER) for patients with severe mitral regurgitation (MR) who were at high risk of surgery. Setting: Estimation of patient survival in cost-effectiveness studies. Participants: The EVEREST II HSR Study included 78 patients who had TEER of the mitral valve using the MitraClip device and a retrospectively identified control group of 36 patients who received medical management and were followed up for 12 months. Observed survival (TEER arm only) was updated at 5 years. Results: Two studies used 12-month observed mortality from EVEREST II HSR to model survival over lifetime horizons. Observed and modelled survival were associated with considerable uncertainty due to short follow-up and small numbers of participants. Modelling control patients' survival required an approximate 10-fold extrapolation based on 12-month observation of only 38 patients. Observed 5-year survival in the TEER group differed from that less mature follow-up suggesting that survival modelling based on shorter follow-up was unsatisfactory. No public domain data for the control group are available beyond 12-month follow-up so meaningful estimates using mature data forAbstract : Objective: To review the survival modelling used in cost-effectiveness studies evaluating an interventional procedure and to discuss implications for decision-makers. Design: A case study of three economic evaluations that each used immature data from the EVEREST II High Surgical Risk (HSR) Study of transcatheter edge-to-edge repair (TEER) for patients with severe mitral regurgitation (MR) who were at high risk of surgery. Setting: Estimation of patient survival in cost-effectiveness studies. Participants: The EVEREST II HSR Study included 78 patients who had TEER of the mitral valve using the MitraClip device and a retrospectively identified control group of 36 patients who received medical management and were followed up for 12 months. Observed survival (TEER arm only) was updated at 5 years. Results: Two studies used 12-month observed mortality from EVEREST II HSR to model survival over lifetime horizons. Observed and modelled survival were associated with considerable uncertainty due to short follow-up and small numbers of participants. Modelling control patients' survival required an approximate 10-fold extrapolation based on 12-month observation of only 38 patients. Observed 5-year survival in the TEER group differed from that less mature follow-up suggesting that survival modelling based on shorter follow-up was unsatisfactory. No public domain data for the control group are available beyond 12-month follow-up so meaningful estimates using mature data for both arms are currently not possible. A third study developed survival models using incompletely reported transitions between MR grades in EVEREST II HSR and mortality rates observed for different MR grades derived from a study in an unrelated population. Conclusions: Modelling survival in such small samples followed up for only 12 months is associated with great uncertainty, and cost-effectiveness results based on these analyses should be viewed as premature and used cautiously in reimbursement decisions. … (more)
- Is Part Of:
- BMJ open. Volume 13:Issue 3(2023)
- Journal:
- BMJ open
- Issue:
- Volume 13:Issue 3(2023)
- Issue Display:
- Volume 13, Issue 3 (2023)
- Year:
- 2023
- Volume:
- 13
- Issue:
- 3
- Issue Sort Value:
- 2023-0013-0003-0000
- Page Start:
- Page End:
- Publication Date:
- 2023-03-14
- Subjects:
- cardiology -- clinical trials -- health economics
Medicine -- Research -- Periodicals
610.72 - Journal URLs:
- http://www.bmj.com/archive ↗
http://bmjopen.bmj.com/ ↗ - DOI:
- 10.1136/bmjopen-2021-060423 ↗
- Languages:
- English
- ISSNs:
- 2044-6055
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 26117.xml