Prioritising sub-watersheds using morphometric analysis, principal component analysis, and land use/land cover analysis in the Kinnerasani River basin, India. Issue 3 (30th August 2022)
- Record Type:
- Journal Article
- Title:
- Prioritising sub-watersheds using morphometric analysis, principal component analysis, and land use/land cover analysis in the Kinnerasani River basin, India. Issue 3 (30th August 2022)
- Main Title:
- Prioritising sub-watersheds using morphometric analysis, principal component analysis, and land use/land cover analysis in the Kinnerasani River basin, India
- Authors:
- Shekar, Padala Raja
Mathew, Aneesh - Abstract:
- Abstract: Due to the depletion of natural resources including land and water as a result of rapid population increase, industrialisation, and urbanisation, effective resource management is essential for long-term development. The Kinnerasani Watershed in Telangana State was chosen for the research based on morphological analysis, principal component analysis (PCA), and land use/land cover (LULC) analysis in this study. A catchment's morphometric characteristics, PCA, and LULC analysis can be estimated using geographic information system (GIS) and remote sensing (RS) approaches. The watershed generated 24 sub-watersheds (SWs) in all (SW1–SW24). SWs were ranked using morphometric features, PCA, and LULC features. To determine the final priority of SWs, several morphometric characteristics, including linear, shape, and relief aspects, have been estimated for each SW and given ranks based on compound parameter values. To prioritise SWs, the PCA was used to extract five parameters from morphometric characteristics. The LULC analysis used four characteristics to prioritise the SWs. SW3, SW9, and SW12 have been prioritised for morphometric analysis; SW2 and SW3 have been prioritised for PCA; and SW17, SW19, SW23, and SW24 have been prioritised for LULC analysis. The common SWs within each priority according to three different methodologies are SW4, SW6, SW10, SW13, SW15, and SW21. The results show that the high-priority locations have greater runoff and soil erosion issues, so itAbstract: Due to the depletion of natural resources including land and water as a result of rapid population increase, industrialisation, and urbanisation, effective resource management is essential for long-term development. The Kinnerasani Watershed in Telangana State was chosen for the research based on morphological analysis, principal component analysis (PCA), and land use/land cover (LULC) analysis in this study. A catchment's morphometric characteristics, PCA, and LULC analysis can be estimated using geographic information system (GIS) and remote sensing (RS) approaches. The watershed generated 24 sub-watersheds (SWs) in all (SW1–SW24). SWs were ranked using morphometric features, PCA, and LULC features. To determine the final priority of SWs, several morphometric characteristics, including linear, shape, and relief aspects, have been estimated for each SW and given ranks based on compound parameter values. To prioritise SWs, the PCA was used to extract five parameters from morphometric characteristics. The LULC analysis used four characteristics to prioritise the SWs. SW3, SW9, and SW12 have been prioritised for morphometric analysis; SW2 and SW3 have been prioritised for PCA; and SW17, SW19, SW23, and SW24 have been prioritised for LULC analysis. The common SWs within each priority according to three different methodologies are SW4, SW6, SW10, SW13, SW15, and SW21. The results show that the high-priority locations have greater runoff and soil erosion issues, so it is essential to design and implement watershed management techniques such as check dams, construction of farm ponds, and construction of earthen embankments in these areas. The decision-making authorities might use the findings to plan and implement watershed management initiatives to minimise soil erosion in high-priority locations. HIGHLIGHTS: Sub-watershed prioritisation using GIS and RS approaches is essential for better watershed management. Novel methods like PCA and LULC were introduced to prioritise sub-watersheds. The decision-making authorities may utilise the findings to plan and implement watershed management activities to prevent soil erosion in high-priority locations. Graphical Abstract … (more)
- Is Part Of:
- H2Open journal. Volume 5:Issue 3(2022)
- Journal:
- H2Open journal
- Issue:
- Volume 5:Issue 3(2022)
- Issue Display:
- Volume 5, Issue 3 (2022)
- Year:
- 2022
- Volume:
- 5
- Issue:
- 3
- Issue Sort Value:
- 2022-0005-0003-0000
- Page Start:
- 490
- Page End:
- 514
- Publication Date:
- 2022-08-30
- Subjects:
- LULC -- morphometric analysis -- PCA -- priority -- sub-watersheds
Hydrology -- Periodicals
Water -- Research -- Periodicals
Hydrologie -- Périodiques
Eau -- Recherche -- Périodiques
Hydrology
Water -- Research
Periodical
periodicals
Periodicals
Zeitschrift
Periodicals
Périodiques
363.61 - Journal URLs:
- https://iwaponline.com/h2open ↗
- DOI:
- 10.2166/h2oj.2022.017 ↗
- Languages:
- English
- ISSNs:
- 2616-6518
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library HMNTS - ELD Digital store
- Ingest File:
- 24464.xml