Cite
HARVARD Citation
Xia, T. et al. (2022). Collaborative production and predictive maintenance scheduling for flexible flow shop with stochastic interruptions and monitoring data. Journal of manufacturing systems. pp. 640-652. [Online].
This is an interim version of our Electronic Legal Deposit Catalogue-eJournals and eBooks while we continue to recover from a cyber-attack.
Xia, T. et al. (2022). Collaborative production and predictive maintenance scheduling for flexible flow shop with stochastic interruptions and monitoring data. Journal of manufacturing systems. pp. 640-652. [Online].