A bi-objective evolutionary algorithm for minimizing maximum lateness and total pollution cost on non-identical parallel batch processing machines. (October 2022)
- Record Type:
- Journal Article
- Title:
- A bi-objective evolutionary algorithm for minimizing maximum lateness and total pollution cost on non-identical parallel batch processing machines. (October 2022)
- Main Title:
- A bi-objective evolutionary algorithm for minimizing maximum lateness and total pollution cost on non-identical parallel batch processing machines
- Authors:
- Li, Kai
Zhang, Han
Chu, Chengbin
Jia, Zhao-hong
Wang, Yan - Abstract:
- Abstract: The concept of sustainable development, which strives to protect the environment while developing economic and industrial sectors, has received widespread attention. This paper takes the fabric dyeing process in the textile industry as an example to study the problem of minimizing the total pollution cost and the maximum lateness on non-identical parallel batch processing machines with different unit pollution costs. This paper analyzes the characteristics of the batch scheduling problem and proposes a method of constructively generating the initial solutions based on these characteristics. Meanwhile, An environment selection based on hierarchical clustering is proposed. This paper develops an NSGA-CC algorithm combining the above two methods in the NSGA-II framework to solve this bi-objective problem. Through extensive simulation experiments, NSGA-CC is compared with several latest algorithms, and then the experimental results show that the proposed algorithm outperforms compared algorithms. Highlights: A bi-objective problem on non-identical parallel BPMs with costs is presented. An NSGA-CC algorithm is developed to solve the presented problem. A constructively generating solutions strategy is proposed to improve convergence. A cluster-based environmental selection strategy is designed to improve diversity.
- Is Part Of:
- Computers & industrial engineering. Volume 172:Part A(2022)
- Journal:
- Computers & industrial engineering
- Issue:
- Volume 172:Part A(2022)
- Issue Display:
- Volume 172, Issue 1 (2022)
- Year:
- 2022
- Volume:
- 172
- Issue:
- 1
- Issue Sort Value:
- 2022-0172-0001-0000
- Page Start:
- Page End:
- Publication Date:
- 2022-10
- Subjects:
- Scheduling -- Batch processing machine -- Lateness -- Total pollution cost -- Evolutionary algorithm
Engineering -- Data processing -- Periodicals
Industrial engineering -- Periodicals
620.00285 - Journal URLs:
- http://www.sciencedirect.com/science/journal/03608352 ↗
http://www.elsevier.com/journals ↗ - DOI:
- 10.1016/j.cie.2022.108608 ↗
- Languages:
- English
- ISSNs:
- 0360-8352
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 3394.713000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 23954.xml