Understanding off-site readiness in Indian construction organisations. Issue 1 (27th March 2020)
- Record Type:
- Journal Article
- Title:
- Understanding off-site readiness in Indian construction organisations. Issue 1 (27th March 2020)
- Main Title:
- Understanding off-site readiness in Indian construction organisations
- Authors:
- Bendi, Deepthi
Rana, Muhammad Qasim
Arif, Mohammed
Goulding, Jack Steven
Kaushik, Amit Kant - Abstract:
- Abstract : Purpose: This paper presents a bespoke model for understanding off-site construction (OSC) readiness among Indian construction organisations. This model presents 17 variables for discussion, the results from which help support OSC strategic decision-making. Design/methodology/approach: Factor analysis was used to investigate the relationship between variables to group them into factors. After identifying 26 different variables, these were reduced to 17 using factor analysis and categorised into four groups. Descriptive statistical analysis and factor analysis using SPSS was used to develop a hierarchy of factors that affect OSC readiness in India. These findings were reinforced by five domain experts to support the results. Findings: Minimising on-site duration, ensuring cost and time certainty and transportation issues were identified as the three most important factors, whereas lack of guidance and scepticism were among the lowest factors affecting the Indian OSC sector. Research limitations/implications: This research is specifically focused on OSC within the Indian construction sector. As such, data collection, propagation and analysis should be constrained to the population context regarding inference, generalisability and repeatability. Practical implications: The proffered OSC readiness model offers OSC practitioners an ability to assess the OSC readiness of construction organisations in India. This includes the evaluation and benchmarking of processes inAbstract : Purpose: This paper presents a bespoke model for understanding off-site construction (OSC) readiness among Indian construction organisations. This model presents 17 variables for discussion, the results from which help support OSC strategic decision-making. Design/methodology/approach: Factor analysis was used to investigate the relationship between variables to group them into factors. After identifying 26 different variables, these were reduced to 17 using factor analysis and categorised into four groups. Descriptive statistical analysis and factor analysis using SPSS was used to develop a hierarchy of factors that affect OSC readiness in India. These findings were reinforced by five domain experts to support the results. Findings: Minimising on-site duration, ensuring cost and time certainty and transportation issues were identified as the three most important factors, whereas lack of guidance and scepticism were among the lowest factors affecting the Indian OSC sector. Research limitations/implications: This research is specifically focused on OSC within the Indian construction sector. As such, data collection, propagation and analysis should be constrained to the population context regarding inference, generalisability and repeatability. Practical implications: The proffered OSC readiness model offers OSC practitioners an ability to assess the OSC readiness of construction organisations in India. This includes the evaluation and benchmarking of processes in both strategic and operational phases, including highlighting areas of concern and scope for further development (to achieve optimal advantage of OSC methods). Originality/value: Originality rests with the use of factor analysis and descriptive statistical analysis to study the influence of different construction-related factors and variables on the OSC sector in India. This impact readiness model is context-specific to the Indian OSC sector – providing a unique insight into the causal factors and dependencies that can affect the adoption and uptake of modern methods of construction in India. … (more)
- Is Part Of:
- Construction innovation. Volume 21:Issue 1(2021)
- Journal:
- Construction innovation
- Issue:
- Volume 21:Issue 1(2021)
- Issue Display:
- Volume 21, Issue 1 (2021)
- Year:
- 2021
- Volume:
- 21
- Issue:
- 1
- Issue Sort Value:
- 2021-0021-0001-0000
- Page Start:
- 105
- Page End:
- 122
- Publication Date:
- 2020-03-27
- Subjects:
- Off-site construction (OSC) -- Indian construction industry -- Housing -- Modular construction -- Strategy -- Process
Construction industry -- Data processing -- Periodicals
Information technology -- Management -- Periodicals
690.0285 - Journal URLs:
- http://info.emeraldinsight.com/products/journals/journals.htm?id=ci ↗
http://www.emeraldinsight.com/journals.htm?issn=1471-4175 ↗
http://www.emeraldinsight.com/ ↗ - DOI:
- 10.1108/CI-02-2020-0016 ↗
- Languages:
- English
- ISSNs:
- 1471-4175
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 3421.309390
British Library DSC - BLDSS-3PM
British Library STI - ELD Digital store - Ingest File:
- 23801.xml