Including operational aspects in the planning of power systems with large amounts of variable generation: A review of modeling approaches. Issue 5 (6th March 2019)
- Record Type:
- Journal Article
- Title:
- Including operational aspects in the planning of power systems with large amounts of variable generation: A review of modeling approaches. Issue 5 (6th March 2019)
- Main Title:
- Including operational aspects in the planning of power systems with large amounts of variable generation: A review of modeling approaches
- Authors:
- Helistö, Niina
Kiviluoma, Juha
Holttinen, Hannele
Lara, Jose Daniel
Hodge, Bri‐Mathias - Abstract:
- Abstract : In the past, power system planning was based on meeting the load duration curve at minimum cost. The increasing share of variable generation (VG) makes operational constraints more important in the planning problem, and there is more and more interest in considering aspects such as sufficient ramping capability, sufficient reserve procurement, power system stability, storage behavior, and the integration of other energy sectors often through demand response assets. In VG integration studies, several methods have been applied to combine the planning and operational timescales. We present a four‐level categorization for the modeling methods, in order of increasing complexity: (1a) investment model only, (1b) operational model only, (2) unidirectionally soft‐linked investment and operational models, (3a) bidirectionally soft‐linked investment and operational models, (3b) operational model with an investment update algorithm, and (4) co‐optimization of investments and operation. The review shows that using a low temporal resolution or only few representative days will not suffice in order to determine the optimal generation portfolio. In addition, considering operational effects proves to be important in order to get a more optimal generation portfolio and more realistic estimations of system costs. However, operational details appear to be less significant than the temporal representation. Furthermore, the benefits and impacts of more advanced modeling techniques onAbstract : In the past, power system planning was based on meeting the load duration curve at minimum cost. The increasing share of variable generation (VG) makes operational constraints more important in the planning problem, and there is more and more interest in considering aspects such as sufficient ramping capability, sufficient reserve procurement, power system stability, storage behavior, and the integration of other energy sectors often through demand response assets. In VG integration studies, several methods have been applied to combine the planning and operational timescales. We present a four‐level categorization for the modeling methods, in order of increasing complexity: (1a) investment model only, (1b) operational model only, (2) unidirectionally soft‐linked investment and operational models, (3a) bidirectionally soft‐linked investment and operational models, (3b) operational model with an investment update algorithm, and (4) co‐optimization of investments and operation. The review shows that using a low temporal resolution or only few representative days will not suffice in order to determine the optimal generation portfolio. In addition, considering operational effects proves to be important in order to get a more optimal generation portfolio and more realistic estimations of system costs. However, operational details appear to be less significant than the temporal representation. Furthermore, the benefits and impacts of more advanced modeling techniques on the resulting generation capacity mix significantly depend on the system properties. Thus, the choice of the model should depend on the purpose of the study as well as on system characteristics. This article is categorized under: Wind Power > Systems and Infrastructure Energy Systems Analysis > Economics and Policy Energy Policy and Planning > Economics and Policy Abstract : Energy and power system models can be categorized into four levels based on the complexity captured in terms of planning and operation. … (more)
- Is Part Of:
- Wiley interdisciplinary reviews. Volume 8:Issue 5(2019)
- Journal:
- Wiley interdisciplinary reviews
- Issue:
- Volume 8:Issue 5(2019)
- Issue Display:
- Volume 8, Issue 5 (2019)
- Year:
- 2019
- Volume:
- 8
- Issue:
- 5
- Issue Sort Value:
- 2019-0008-0005-0000
- Page Start:
- n/a
- Page End:
- n/a
- Publication Date:
- 2019-03-06
- Subjects:
- generation expansion planning -- integration of renewable energy sources -- operational constraints -- power system planning -- temporal representation
Power resources -- Environmental aspects -- Periodicals
Power resources -- Periodicals
Renewable energy sources -- Periodicals
Energy policy -- Environmental aspects -- Periodicals
Electronic journals
333.79 - Journal URLs:
- http://onlinelibrary.wiley.com/journal/10.1002/(ISSN)2041-840X ↗
http://wires.wiley.com/WileyCDA/WiresJournal/wisId-WENE.html ↗
http://onlinelibrary.wiley.com/ ↗ - DOI:
- 10.1002/wene.341 ↗
- Languages:
- English
- ISSNs:
- 2041-8396
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 9838.207000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 23744.xml