Closed-loop Scheduling in a canned food factory. Issue 2 (2020)
- Record Type:
- Journal Article
- Title:
- Closed-loop Scheduling in a canned food factory. Issue 2 (2020)
- Main Title:
- Closed-loop Scheduling in a canned food factory
- Authors:
- Palacín, C.G.
Vilas, C.
Alonso, A.A.
Pitarch, José L.
Prada, C. de - Abstract:
- Abstract: This paper addresses the problem of closed-loop operation of scheduling, together with the interaction of control and scheduling, for a class of processes that appear very often in industry: those that combine continuous production lines with parallel batch units that share some resources. The paper presents a novel approach to this problem, including batching and a new type of precedence in the assignment problem. It also considers the effect of shared resources on the duration of the cycle time of the batch units. The approach is illustrated with a real-life example of a canned tuna factory
- Is Part Of:
- IFAC-PapersOnLine. Volume 53:Issue 2(2020)
- Journal:
- IFAC-PapersOnLine
- Issue:
- Volume 53:Issue 2(2020)
- Issue Display:
- Volume 53, Issue 2 (2020)
- Year:
- 2020
- Volume:
- 53
- Issue:
- 2
- Issue Sort Value:
- 2020-0053-0002-0000
- Page Start:
- 10791
- Page End:
- 10796
- Publication Date:
- 2020
- Subjects:
- Integration of scheduling -- control -- shared resources -- tuna cans sterilisation -- process optimisation -- continuous-batch process scheduling
Automatic control -- Periodicals
629.805 - Journal URLs:
- https://www.journals.elsevier.com/ifac-papersonline/ ↗
http://www.sciencedirect.com/ ↗ - DOI:
- 10.1016/j.ifacol.2020.12.2863 ↗
- Languages:
- English
- ISSNs:
- 2405-8963
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 23748.xml