A bicriterion single-machine scheduling problem with step-improving processing times. (September 2022)
- Record Type:
- Journal Article
- Title:
- A bicriterion single-machine scheduling problem with step-improving processing times. (September 2022)
- Main Title:
- A bicriterion single-machine scheduling problem with step-improving processing times
- Authors:
- Wu, Chin-Chia
Lin, Win-Chin
Azzouz, Ameni
Xu, Jianyou
Chiu, Yen-Lin
Tsai, Yung-Wei
Shen, Pengyi - Abstract:
- Highlights: Step-improving processing times scheduling to minimize a bicriterion. Branch-and-bound algorithm are used for exact solutions. Two metaheuristic algorithms proposed to solve this problem approximately. Performances of algorithms are evaluated through computational experiments. Abstract: Time-dependent scheduling problems, where the real processing time of jobs is dependent on the starting time, have received growing attention in recent decades. In particular, scheduling problems on a single machine have been widely studied in many facets that address the learning effect and diverse processing environments or time-dependent processing scheduling. Motivated by this observation, we introduce a variant based on the industrial procedure consideration; that is, owing to due date pressure, the processing time of the remaining jobs should be shortened after a period of manufacturing process. We consider a new single-machine scheduling problem with step-improving processing times where the objective function is to find a schedule to minimize a linear combination of the total weighted completion time and total tardiness of all jobs. The proposed problem without a critical date is an NP-hard problem. Therefore, a mixed integer programming model as well as a branch-and-bound (B&B) along with several dominance properties and a lower bound on the completion of an active partial schedule is utilized for solving the problem under study. Subsequently, four variants of the waterHighlights: Step-improving processing times scheduling to minimize a bicriterion. Branch-and-bound algorithm are used for exact solutions. Two metaheuristic algorithms proposed to solve this problem approximately. Performances of algorithms are evaluated through computational experiments. Abstract: Time-dependent scheduling problems, where the real processing time of jobs is dependent on the starting time, have received growing attention in recent decades. In particular, scheduling problems on a single machine have been widely studied in many facets that address the learning effect and diverse processing environments or time-dependent processing scheduling. Motivated by this observation, we introduce a variant based on the industrial procedure consideration; that is, owing to due date pressure, the processing time of the remaining jobs should be shortened after a period of manufacturing process. We consider a new single-machine scheduling problem with step-improving processing times where the objective function is to find a schedule to minimize a linear combination of the total weighted completion time and total tardiness of all jobs. The proposed problem without a critical date is an NP-hard problem. Therefore, a mixed integer programming model as well as a branch-and-bound (B&B) along with several dominance properties and a lower bound on the completion of an active partial schedule is utilized for solving the problem under study. Subsequently, four variants of the water wave optimization algorithm and four variants of the simulated annealing algorithms were proposed to solve this problem. The simulation results showed that the branch-and-bound method can solve instance problems for up to twelve jobs. The results also showed that all four variants of the wave optimization algorithm did not perform uniformly better than all three variants of the simulated annealing algorithms. … (more)
- Is Part Of:
- Computers & industrial engineering. Volume 171(2022)
- Journal:
- Computers & industrial engineering
- Issue:
- Volume 171(2022)
- Issue Display:
- Volume 171, Issue 2022 (2022)
- Year:
- 2022
- Volume:
- 171
- Issue:
- 2022
- Issue Sort Value:
- 2022-0171-2022-0000
- Page Start:
- Page End:
- Publication Date:
- 2022-09
- Subjects:
- Machine scheduling -- Learning effect -- Water wave optimization -- Simulated annealing
Engineering -- Data processing -- Periodicals
Industrial engineering -- Periodicals
620.00285 - Journal URLs:
- http://www.sciencedirect.com/science/journal/03608352 ↗
http://www.elsevier.com/journals ↗ - DOI:
- 10.1016/j.cie.2022.108469 ↗
- Languages:
- English
- ISSNs:
- 0360-8352
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 3394.713000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 23717.xml