Work continuity constraints in repetitive project scheduling considering soft logic. Issue 6 (22nd September 2020)
- Record Type:
- Journal Article
- Title:
- Work continuity constraints in repetitive project scheduling considering soft logic. Issue 6 (22nd September 2020)
- Main Title:
- Work continuity constraints in repetitive project scheduling considering soft logic
- Authors:
- Zou, Xin
Wu, Guangchuan
Zhang, Qian - Abstract:
- Abstract : Purpose: Repetitive projects play an important role in the construction industry. A crucial point in scheduling this type of project lies in enabling timely movement of crews from unit to unit so as to minimize the adverse effect of work interruptions on both time and cost. This paper aims to examine a repetitive scheduling problem with work continuity constraints, involving a tradeoff among project duration, work interruptions and total project cost (TPC). To enhance flexibility and practicability, multi-crew execution is considered and the logic relation between units is allowed to be changed arbitrarily. That is, soft logic is considered. Design/methodology/approach: This paper proposes a multi-objective mixed-integer linear programming model with the capability of yielding the optimal tradeoff among three conflicting objectives. An efficient version of the e-constraint algorithm is customized to solve the model. This model is validated based on two case studies involving a small-scale and a practical-scale project, and the influence of using soft logic on project duration and total cost is analyzed via computational experiments. Findings: Using soft logic provides more flexibility in minimizing project duration, work interruptions and TPC, especial for non-typical projects with a high percentage of non-typical activities. Research limitations/implications: The main limitation of the proposed model fails to consider the learning-forgetting phenomenon, whichAbstract : Purpose: Repetitive projects play an important role in the construction industry. A crucial point in scheduling this type of project lies in enabling timely movement of crews from unit to unit so as to minimize the adverse effect of work interruptions on both time and cost. This paper aims to examine a repetitive scheduling problem with work continuity constraints, involving a tradeoff among project duration, work interruptions and total project cost (TPC). To enhance flexibility and practicability, multi-crew execution is considered and the logic relation between units is allowed to be changed arbitrarily. That is, soft logic is considered. Design/methodology/approach: This paper proposes a multi-objective mixed-integer linear programming model with the capability of yielding the optimal tradeoff among three conflicting objectives. An efficient version of the e-constraint algorithm is customized to solve the model. This model is validated based on two case studies involving a small-scale and a practical-scale project, and the influence of using soft logic on project duration and total cost is analyzed via computational experiments. Findings: Using soft logic provides more flexibility in minimizing project duration, work interruptions and TPC, especial for non-typical projects with a high percentage of non-typical activities. Research limitations/implications: The main limitation of the proposed model fails to consider the learning-forgetting phenomenon, which provides space for future research. Practical implications: This study assists practitioners in determining the "most preferred" schedule once additional information is provided. Originality/value: This paper presents a new soft logic-based mathematical programming model to schedule repetitive projects with the goal of optimizing three conflicting objectives simultaneously. … (more)
- Is Part Of:
- Engineering, construction and architectural management. Volume 28:Issue 6(2021)
- Journal:
- Engineering, construction and architectural management
- Issue:
- Volume 28:Issue 6(2021)
- Issue Display:
- Volume 28, Issue 6 (2021)
- Year:
- 2021
- Volume:
- 28
- Issue:
- 6
- Issue Sort Value:
- 2021-0028-0006-0000
- Page Start:
- 1713
- Page End:
- 1738
- Publication Date:
- 2020-09-22
- Subjects:
- Repetitive construction -- Optimization -- Work continuity -- Soft logic
Construction industry -- Management -- Periodicals
Engineering -- Management -- Periodicals
Engineering -- Periodicals
Building -- Periodicals
624.068 - Journal URLs:
- http://www.emeraldinsight.com/journals.htm?issn=0969-9988 ↗
http://www.emeraldinsight.com/ ↗
http://www.blackwell-synergy.com/member/institutions/issuelist.asp?journal=eca ↗ - DOI:
- 10.1108/ECAM-11-2019-0595 ↗
- Languages:
- English
- ISSNs:
- 0969-9988
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 3758.609000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 23004.xml