A new analytical method to optimise the preventive maintenance interval by using a semi-Markov process and z-transform with an application to marine diesel engines. (March 2021)
- Record Type:
- Journal Article
- Title:
- A new analytical method to optimise the preventive maintenance interval by using a semi-Markov process and z-transform with an application to marine diesel engines. (March 2021)
- Main Title:
- A new analytical method to optimise the preventive maintenance interval by using a semi-Markov process and z-transform with an application to marine diesel engines
- Authors:
- Sánchez-Herguedas, Antonio
Mena-Nieto, Angel
Rodrigo-Muñoz, Francisco - Abstract:
- Highlights: A new analytical method to calculate the preventive interval is proposed. The preventive interval is the time that maximises the returns (income minus costs). A semi-Markov process approach has been developed to model the returns. The z-transform is used as a tool to solve the resulting difference equations system. A real case study of the marine diesel engine is used to apply this analytical method. Abstract: This article presents a novel method based on a semi-Markov process approach and the z transform to calculate the optimal time interval until the preventive maintenance intervention. For this, a mathematical expression that has its origin in the evolution of the maintenance cost of a patrol boat's propulsion engine is developed, represented mathematically by a system of difference equations. This method can be applied to all assets that are subject to wear, which are very common on industrial facilities. This mathematical expression for the preventive interval is a powerful tool for maintenance managers because this saves him from resorting to complicated mathematical methods. In addition to the proposed mathematical formula, the manager needs to know the assets' failure history data and the costs of maintenance interventions. These data are usually available, making their practical application fast and easy to develop. Due to the method being analytical, it could also serve as an excellent decision support tool. It can be applied to the desired timeHighlights: A new analytical method to calculate the preventive interval is proposed. The preventive interval is the time that maximises the returns (income minus costs). A semi-Markov process approach has been developed to model the returns. The z-transform is used as a tool to solve the resulting difference equations system. A real case study of the marine diesel engine is used to apply this analytical method. Abstract: This article presents a novel method based on a semi-Markov process approach and the z transform to calculate the optimal time interval until the preventive maintenance intervention. For this, a mathematical expression that has its origin in the evolution of the maintenance cost of a patrol boat's propulsion engine is developed, represented mathematically by a system of difference equations. This method can be applied to all assets that are subject to wear, which are very common on industrial facilities. This mathematical expression for the preventive interval is a powerful tool for maintenance managers because this saves him from resorting to complicated mathematical methods. In addition to the proposed mathematical formula, the manager needs to know the assets' failure history data and the costs of maintenance interventions. These data are usually available, making their practical application fast and easy to develop. Due to the method being analytical, it could also serve as an excellent decision support tool. It can be applied to the desired time horizon guaranteeing the obtention of the optimal interval. In many other cases, applying the model can simplify the process of obtaining the asset maintenance programme, from an economic perspective. Graphical abstract: Image, graphical abstract … (more)
- Is Part Of:
- Reliability engineering & system safety. Volume 207(2021)
- Journal:
- Reliability engineering & system safety
- Issue:
- Volume 207(2021)
- Issue Display:
- Volume 207, Issue 2021 (2021)
- Year:
- 2021
- Volume:
- 207
- Issue:
- 2021
- Issue Sort Value:
- 2021-0207-2021-0000
- Page Start:
- Page End:
- Publication Date:
- 2021-03
- Subjects:
- Maintenance interval -- Maintenance model -- Semi-Markov process -- Finite horizon -- Maintenance cost
Reliability (Engineering) -- Periodicals
System safety -- Periodicals
Industrial safety -- Periodicals
Fiabilité -- Périodiques
Sécurité des systèmes -- Périodiques
Sécurité du travail -- Périodiques
620.00452 - Journal URLs:
- http://www.sciencedirect.com/science/journal/09518320 ↗
http://www.elsevier.com/journals ↗ - DOI:
- 10.1016/j.ress.2020.107394 ↗
- Languages:
- English
- ISSNs:
- 0951-8320
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 7356.422700
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 22499.xml