Feasibility study of a combined system of electricity generation and cooling from liquefied natural gas to reduce the electricity cost of data centres. (1st September 2022)
- Record Type:
- Journal Article
- Title:
- Feasibility study of a combined system of electricity generation and cooling from liquefied natural gas to reduce the electricity cost of data centres. (1st September 2022)
- Main Title:
- Feasibility study of a combined system of electricity generation and cooling from liquefied natural gas to reduce the electricity cost of data centres
- Authors:
- Sermsuk, Maytungkorn
Sukjai, Yanin
Wiboonrat, Montri
Kiatkittipong, Kunlanan - Abstract:
- Abstract: Global data centre power demands would expand from 286 TWh in 2016 to around 321 TWh in 2030. The cooling system represents electricity consumption of approximately 40–50% of the total energy used. The global LNG trade has reached 356.1 MTPA. Cold energy equal to 89025 GW is released into the ocean. Therefore, this study focused on the technical and economic feasibility of an LNG receiving terminal combined with a data centre using a direct expansion cycle (DEC), a Rankine cycle (RC) and a combination of Rankine cycle and direct expansion cycle (RC + DEC) under different natural gas distribution pressures to produce a supply of cooling water and electricity to reduce electricity consumption and greenhouse gas emissions. According to the study, the RC + DEC produces the maximum cold water at 7 °C, with the total cold energy of 44.23 MW which is sufficient for cooling a data centre with a capacity of 5345 racks, to reduce the electricity for conventional cooling system is 13521 kWh and generated electricity form turbine is 9968 kWh. This research has the potential to reduce the operating costs of data centres by more than USD 23.87 million per annum as well as CO2 emissions by 83859 t per annum with exergy efficiency of 78.94%. In an economic study, indicated a payback period of 1.60 years with an IRR of 62%. Highlights: Thermodynamic analysis of cold energy recovery for LNG terminals has been performed. A combination of Organic Rankine Cycle (ORC) and DirectAbstract: Global data centre power demands would expand from 286 TWh in 2016 to around 321 TWh in 2030. The cooling system represents electricity consumption of approximately 40–50% of the total energy used. The global LNG trade has reached 356.1 MTPA. Cold energy equal to 89025 GW is released into the ocean. Therefore, this study focused on the technical and economic feasibility of an LNG receiving terminal combined with a data centre using a direct expansion cycle (DEC), a Rankine cycle (RC) and a combination of Rankine cycle and direct expansion cycle (RC + DEC) under different natural gas distribution pressures to produce a supply of cooling water and electricity to reduce electricity consumption and greenhouse gas emissions. According to the study, the RC + DEC produces the maximum cold water at 7 °C, with the total cold energy of 44.23 MW which is sufficient for cooling a data centre with a capacity of 5345 racks, to reduce the electricity for conventional cooling system is 13521 kWh and generated electricity form turbine is 9968 kWh. This research has the potential to reduce the operating costs of data centres by more than USD 23.87 million per annum as well as CO2 emissions by 83859 t per annum with exergy efficiency of 78.94%. In an economic study, indicated a payback period of 1.60 years with an IRR of 62%. Highlights: Thermodynamic analysis of cold energy recovery for LNG terminals has been performed. A combination of Organic Rankine Cycle (ORC) and Direct Expansion Cycle (DEC) was used. Around 44.23 MW can be recovered from LNG regasification as electricity and cooling water. The synergy of data centre and LNG receiving terminal improved exergy efficiency by 78.94%. Improve the cost effectiveness and competitive advantage of data centres and LNG receiving terminals. … (more)
- Is Part Of:
- Energy. Volume 254:Part A(2022)
- Journal:
- Energy
- Issue:
- Volume 254:Part A(2022)
- Issue Display:
- Volume 254, Issue 1 (2022)
- Year:
- 2022
- Volume:
- 254
- Issue:
- 1
- Issue Sort Value:
- 2022-0254-0001-0000
- Page Start:
- Page End:
- Publication Date:
- 2022-09-01
- Subjects:
- LNG -- Cold energy utilisation -- Power generation -- Data centre -- Free cooling -- Energy efficiency
Power resources -- Periodicals
Power (Mechanics) -- Periodicals
Energy consumption -- Periodicals
333.7905 - Journal URLs:
- http://www.elsevier.com/journals ↗
- DOI:
- 10.1016/j.energy.2022.124397 ↗
- Languages:
- English
- ISSNs:
- 0360-5442
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 3747.445000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 22304.xml