Performance analysis of utility tunneling data: A case study of pipe jacking in hard rock in Brittany, France. (September 2022)
- Record Type:
- Journal Article
- Title:
- Performance analysis of utility tunneling data: A case study of pipe jacking in hard rock in Brittany, France. (September 2022)
- Main Title:
- Performance analysis of utility tunneling data: A case study of pipe jacking in hard rock in Brittany, France
- Authors:
- Lehmann, Gabriel
Käsling, Heiko
Cambier, Alexandre
Praetorius, Steffen
Thuro, Kurosch - Abstract:
- Highlights: First comprehensive analysis of pipe jacking data in very strong metamorphic rocks. Case study of a 530 m long tunnel with a 2.2 m diameter Slurry TBM in France. Focus of project was not maximum advance speed, but a safe tunneling procedure. Average advance rate of 17.3 mm/min; specific skin friction well below 2 kN/m 2 . Penetration prediction of pipe jacking projects is difficult with common models. Abstract: The increasing demand for renewable energy is accompanied with an urgent need for new and improved infrastructures worldwide, which in turn will require a greater number of utility tunneling projects in rock. Mainly due to tighter safety regulations, hard rock pipe jacking is getting increasingly important in the utility tunneling industry. Based on the example of the 530 m long Landivisiau utility tunnel case study, we present the first comprehensive pipe jacking study in high strength metamorphic rocks. The procedures and associated challenges of data analysis of a small-diameter pipe jacking project are presented and discussed. The tunnel has an outer diameter of 2.2 m and was excavated in Variscan basement rocks of Brittany. The geotechnical conditions at Landivisiau were very heterogeneous and stronger than expected, comprising fresh to highly weathered, weak to very strong gneiss, granite and schist with an UCS of up to 185 MPa. The TBM achieved an average advance rate of 17.3 mm/min and an average penetration rate of 3.4 mm/rev. The advance andHighlights: First comprehensive analysis of pipe jacking data in very strong metamorphic rocks. Case study of a 530 m long tunnel with a 2.2 m diameter Slurry TBM in France. Focus of project was not maximum advance speed, but a safe tunneling procedure. Average advance rate of 17.3 mm/min; specific skin friction well below 2 kN/m 2 . Penetration prediction of pipe jacking projects is difficult with common models. Abstract: The increasing demand for renewable energy is accompanied with an urgent need for new and improved infrastructures worldwide, which in turn will require a greater number of utility tunneling projects in rock. Mainly due to tighter safety regulations, hard rock pipe jacking is getting increasingly important in the utility tunneling industry. Based on the example of the 530 m long Landivisiau utility tunnel case study, we present the first comprehensive pipe jacking study in high strength metamorphic rocks. The procedures and associated challenges of data analysis of a small-diameter pipe jacking project are presented and discussed. The tunnel has an outer diameter of 2.2 m and was excavated in Variscan basement rocks of Brittany. The geotechnical conditions at Landivisiau were very heterogeneous and stronger than expected, comprising fresh to highly weathered, weak to very strong gneiss, granite and schist with an UCS of up to 185 MPa. The TBM achieved an average advance rate of 17.3 mm/min and an average penetration rate of 3.4 mm/rev. The advance and penetration rates of the TBM are compared with results obtained by recent force estimation and penetration models. This study was conducted to raise awareness about the importance of using geological and technical data, to cope with increasingly strict controls by local authorities and to provide a foundation for further analysis and use of data, especially with respect to future automated tunneling. … (more)
- Is Part Of:
- Tunnelling and underground space technology. Volume 127(2022)
- Journal:
- Tunnelling and underground space technology
- Issue:
- Volume 127(2022)
- Issue Display:
- Volume 127, Issue 2022 (2022)
- Year:
- 2022
- Volume:
- 127
- Issue:
- 2022
- Issue Sort Value:
- 2022-0127-2022-0000
- Page Start:
- Page End:
- Publication Date:
- 2022-09
- Subjects:
- Utility tunneling -- Pipe jacking -- Case study -- Hard rock -- TBM performance
Tunneling -- Periodicals
Underground construction -- Periodicals
Tunnels -- Periodicals
Underground areas -- Periodicals
624.193 - Journal URLs:
- http://www.sciencedirect.com/science/journal/08867798 ↗
http://www.elsevier.com/journals ↗ - DOI:
- 10.1016/j.tust.2022.104574 ↗
- Languages:
- English
- ISSNs:
- 0886-7798
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 9071.405000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 22280.xml