Cite
HARVARD Citation
Bradu, B. et al. (2022). Beam induced heat load instrumentation installed in LHC during the Long Shutdown 2. IOP conference series. 1240 (1), p. . [Online].
This is an interim version of our Electronic Legal Deposit Catalogue-eJournals and eBooks while we continue to recover from a cyber-attack.
Bradu, B. et al. (2022). Beam induced heat load instrumentation installed in LHC during the Long Shutdown 2. IOP conference series. 1240 (1), p. . [Online].