Olawumi, Timothy Oluwatosin - Abstract:
- Abstract : Purpose: This paper aims to assess the level of awareness of quantity surveyors in material management and their key roles in waste minimization during the post-contract stage of the project with a view of achieving value for money in their roles. Design/methodology/approach: This involves administering a questionnaire survey to registered members of the Nigerian Institute of Quantity Surveyors, the only recognized professional body of quantity surveyors in Nigeria, within Lagos state. The empirical questionnaire survey succeeds a literature review that isolates the key strategies used by quantity surveyors in material management and waste minimization at the post-contract stage. The validity of the questionnaire was carried out by two experienced construction industry researchers and three experienced professional quantity surveyors to ensure that the questionnaire was not ambiguous and that it consists of the right questions in tandem with the research. The respondents were grouped into consultant's QS and contractor's QS. Findings: Key roles of quantity surveyors during the material management process are proper material storage, and material inventory and accounting are the most important material management and waste minimization practices during the institute stage. It revealed that there is a lack of material waste documentation practices during the construction stage. In addition, there is no statistically significant difference in the responses of the twoAbstract : Purpose: This paper aims to assess the level of awareness of quantity surveyors in material management and their key roles in waste minimization during the post-contract stage of the project with a view of achieving value for money in their roles. Design/methodology/approach: This involves administering a questionnaire survey to registered members of the Nigerian Institute of Quantity Surveyors, the only recognized professional body of quantity surveyors in Nigeria, within Lagos state. The empirical questionnaire survey succeeds a literature review that isolates the key strategies used by quantity surveyors in material management and waste minimization at the post-contract stage. The validity of the questionnaire was carried out by two experienced construction industry researchers and three experienced professional quantity surveyors to ensure that the questionnaire was not ambiguous and that it consists of the right questions in tandem with the research. The respondents were grouped into consultant's QS and contractor's QS. Findings: Key roles of quantity surveyors during the material management process are proper material storage, and material inventory and accounting are the most important material management and waste minimization practices during the institute stage. It revealed that there is a lack of material waste documentation practices during the construction stage. In addition, there is no statistically significant difference in the responses of the two groups. This may be because there is no clear compartmentalization between the practices of the two groups. In addition, these two groups had the same education training, as there is no difference between the educational training of the consultant's QS and contractor's QS. Originality/value: This study assessed the quantity surveyors' roles with regard to material management and waste minimization. It would add to the scanty research work in this area. The study has also successfully revealed the strategies that are to be adopted by the quantity surveyors to achieve value for money during the post-contract stage. … (more)
- Is Part Of:
- Journal of engineering, design and technology. Volume 17:Issue 4(2019)
- Journal:
- Journal of engineering, design and technology
- Issue:
- Volume 17:Issue 4(2019)
- Issue Display:
- Volume 17, Issue 4 (2019)
- Year:
- 2019
- Volume:
- 17
- Issue:
- 4
- Issue Sort Value:
- 2019-0017-0004-0000
- Page Start:
- 793
- Page End:
- 807
- Publication Date:
- 2019-04-23
- Subjects:
- Construction project management -- Waste minimization -- Material management -- Post-contract -- Quantity surveyors
Engineering -- Periodicals
Engineering design -- Periodicals
Industrial design -- Periodicals
Technology -- Periodicals
620.005 - Journal URLs:
- http://firstsearch.oclc.org ↗
http://info.emeraldinsight.com/products/journals/journals.htm?PHPSESSID=vf0n9oto7i08tel2huutrd3n81&id=jedt ↗
http://rzblx1.uni-regensburg.de/ezeit/warpto.phtml?colors=7&jour%5Fid=84581 ↗
http://www.emeraldinsight.com/ ↗ - DOI:
- 10.1108/JEDT-10-2018-0193 ↗
- Languages:
- English
- ISSNs:
- 1726-0531
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 4978.840000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 22201.xml