Applicability of Demand-Driven MRP in a complex manufacturing environment. Issue 14 (17th July 2020)
- Record Type:
- Journal Article
- Title:
- Applicability of Demand-Driven MRP in a complex manufacturing environment. Issue 14 (17th July 2020)
- Main Title:
- Applicability of Demand-Driven MRP in a complex manufacturing environment
- Authors:
- Velasco Acosta, Angela Patricia
Mascle, Christian
Baptiste, Pierre - Abstract:
- Abstract : Push and pull methods have been adopted for specific volume production and uncertainty scenarios in order to plan and control production. The further development of hybrid or integrated methods allows benefit to be drawn from opposing approaches. The literature concerning Demand-Driven Material Requirements Planning (DDMRP) proves its superiority under conditions of internal and external uncertainty for high-volume production compared to the most implemented push method (manufacturing requirements planning MRPII). Companies that have adopted this method, manufacture on average 10–15 parts per product, with 2 or 3 levels of bills of materials. In this paper, we evaluate the applicability of DDMRP in a complex manufacturing environment (e.g. products of four levels of bill of materials) in terms of customer satisfaction and stock levels. Buffered and non-buffered items clustered in seven types of decoupling structures contributed to this complexity. We developed a DDMRP model for planning and execution purposes, which was simulated in ARENA's discrete events software. We analysed the model's on-hand stock and delayed orders. DDMRP works effectively under the manufacturing conditions considered. It is found to prevent inventory stockouts and overstocks, reduce lead time by 41% and reduce stock levels by 18%. The success of this method; however, depends on the strategic positioning of the buffers.
- Is Part Of:
- International journal of production research. Volume 58:Issue 14(2020)
- Journal:
- International journal of production research
- Issue:
- Volume 58:Issue 14(2020)
- Issue Display:
- Volume 58, Issue 14 (2020)
- Year:
- 2020
- Volume:
- 58
- Issue:
- 14
- Issue Sort Value:
- 2020-0058-0014-0000
- Page Start:
- 4233
- Page End:
- 4245
- Publication Date:
- 2020-07-17
- Subjects:
- complex bill of materials -- DDMRP -- decoupling point -- inventory management -- lead time reduction -- simulation
Factory management -- Periodicals
658.57 - Journal URLs:
- http://www.tandfonline.com/toc/tprs20/current ↗
http://www.tandfonline.com/ ↗ - DOI:
- 10.1080/00207543.2019.1650978 ↗
- Languages:
- English
- ISSNs:
- 0020-7543
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 4542.486000
British Library DSC - BLDSS-3PM
British Library STI - ELD Digital store - Ingest File:
- 22180.xml