An integrated OEE framework for structured productivity improvement in a semiconductor manufacturing facility. Issue 5 (6th March 2020)
- Record Type:
- Journal Article
- Title:
- An integrated OEE framework for structured productivity improvement in a semiconductor manufacturing facility. Issue 5 (6th March 2020)
- Main Title:
- An integrated OEE framework for structured productivity improvement in a semiconductor manufacturing facility
- Authors:
- Cheah, Chew Keat
Prakash, Joshua
Ong, Kok Seng - Abstract:
- Abstract : Purpose: The purpose of this paper is to introduce a practical integrated overall equipment effectiveness (OEE) framework that encompasses the core characteristics of OEE. Design/methodology/approach: The paper reviewed the backgrounds of OEE and improvement frameworks and explored the limitations. An integrated OEE framework was developed by synergizing the strengths of OEE and improvement frameworks to complement the shortcomings. This new framework underlies the OEE concepts and provides structural improvement steps. It was applied to systematically assist and guide OEE practitioners in a case study. Findings: The review of OEE literature found that there is a lack of improvement frameworks with systematic steps specifically developed for OEE implementation. Conversely, a review on improvement frameworks of different methodologies revealed that they do not fully capitalize on the use of performance measures as benchmarks and improvement drivers. An integrated framework that incorporated the advantages of both OEE and conventional improvement frameworks was developed and validated through a case study over a period of 38 weeks. The OEE performance before the improvements was low (73.4 percent) due to high availability losses (76.5 percent). Both OEE and availability achieved the target of 76.5 percent and 80 percent, respectively, after using the framework for improvements. Research limitations/implications: The reviewed papers represent a sample of papersAbstract : Purpose: The purpose of this paper is to introduce a practical integrated overall equipment effectiveness (OEE) framework that encompasses the core characteristics of OEE. Design/methodology/approach: The paper reviewed the backgrounds of OEE and improvement frameworks and explored the limitations. An integrated OEE framework was developed by synergizing the strengths of OEE and improvement frameworks to complement the shortcomings. This new framework underlies the OEE concepts and provides structural improvement steps. It was applied to systematically assist and guide OEE practitioners in a case study. Findings: The review of OEE literature found that there is a lack of improvement frameworks with systematic steps specifically developed for OEE implementation. Conversely, a review on improvement frameworks of different methodologies revealed that they do not fully capitalize on the use of performance measures as benchmarks and improvement drivers. An integrated framework that incorporated the advantages of both OEE and conventional improvement frameworks was developed and validated through a case study over a period of 38 weeks. The OEE performance before the improvements was low (73.4 percent) due to high availability losses (76.5 percent). Both OEE and availability achieved the target of 76.5 percent and 80 percent, respectively, after using the framework for improvements. Research limitations/implications: The reviewed papers represent a sample of papers present in the literature and were selected based on relevancy. A greater number of papers incorporated into the literature review would certainly bring out a more comprehensive study. Practical implications: The proposed integrated OEE framework provides OEE practitioners with systematic directions and steps combined with benchmarking and loss prioritization features for effective improvement efforts. In addition, it provides overview for the practitioners to make better decisions in project management. This helps address the common issues of practitioners not sure of what the next improvement step is. A case study using the proposed framework at a semiconductor company had successfully achieved the OEE benchmarks and set target for conversion time. Originality/value: This paper provides a new integrated OEE framework offering a systematic approach toward implementing OEE improvements. … (more)
- Is Part Of:
- International journal of productivity and performance management. Volume 69:Issue 5(2020)
- Journal:
- International journal of productivity and performance management
- Issue:
- Volume 69:Issue 5(2020)
- Issue Display:
- Volume 69, Issue 5 (2020)
- Year:
- 2020
- Volume:
- 69
- Issue:
- 5
- Issue Sort Value:
- 2020-0069-0005-0000
- Page Start:
- 1081
- Page End:
- 1105
- Publication Date:
- 2020-03-06
- Subjects:
- OEE -- Overall equipment effectiveness -- Performance metric -- Improvement framework -- Case study
Industrial productivity -- Periodicals
Performance -- Management -- Periodicals
Performance -- Measurement -- Periodicals
Time study -- Periodicals
Motion study -- Periodicals
658.3125 - Journal URLs:
- http://firstsearch.oclc.org/journal=1741-0401;screen=info;ECOIP ↗
http://www.emeraldinsight.com/journals.htm?issn=1741-0401 ↗
http://www.emeraldinsight.com/ ↗
http://www.emeraldinsight.com/vl=6175444/cl=51/nw=1/rpsv/ijppm.htm ↗ - DOI:
- 10.1108/IJPPM-04-2019-0176 ↗
- Languages:
- English
- ISSNs:
- 1741-0401
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 4542.486200
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 22163.xml