Optimizing time, cost and quality in multi-mode resource-constrained project scheduling. Issue 1 (2nd January 2019)
- Record Type:
- Journal Article
- Title:
- Optimizing time, cost and quality in multi-mode resource-constrained project scheduling. Issue 1 (2nd January 2019)
- Main Title:
- Optimizing time, cost and quality in multi-mode resource-constrained project scheduling
- Authors:
- Kannimuthu, Marimuthu
Raphael, Benny
Palaneeswaran, Ekambaram
Kuppuswamy, Ananthanarayanan - Abstract:
- Abstract : Purpose: The purpose of this paper is to develop a framework to optimize time, cost and quality in a multi-mode resource-constrained project scheduling environment. Design/methodology/approach: A case study approach identified the activity execution modes in building construction projects in India to support multi-mode resource-constrained project scheduling. The data required to compute time, cost and quality of each activity are compiled from real construction projects. A binary integer-programming model has been developed to perform multi-objective optimization and identify Pareto optimal solutions. The RR-PARETO3 algorithm was used to identify the best compromise trade-off solutions. The effectiveness of the proposed framework is demonstrated through sample case study projects. Findings: Results show that good compromise solutions are obtained through multi-objective optimization of time, cost and quality. Research limitations/implications: Case study data sets were collected only from eight building construction projects in India. Practical implications: It is feasible to adopt multi-objective optimization in practical construction projects using time, cost and quality as the objectives; Pareto surfaces help to quantify relationships among time, cost and quality. It is shown that cost can be reduced by increasing the duration, and quality can be improved only by increasing the cost. Originality/value: The use of different activity execution modes compiledAbstract : Purpose: The purpose of this paper is to develop a framework to optimize time, cost and quality in a multi-mode resource-constrained project scheduling environment. Design/methodology/approach: A case study approach identified the activity execution modes in building construction projects in India to support multi-mode resource-constrained project scheduling. The data required to compute time, cost and quality of each activity are compiled from real construction projects. A binary integer-programming model has been developed to perform multi-objective optimization and identify Pareto optimal solutions. The RR-PARETO3 algorithm was used to identify the best compromise trade-off solutions. The effectiveness of the proposed framework is demonstrated through sample case study projects. Findings: Results show that good compromise solutions are obtained through multi-objective optimization of time, cost and quality. Research limitations/implications: Case study data sets were collected only from eight building construction projects in India. Practical implications: It is feasible to adopt multi-objective optimization in practical construction projects using time, cost and quality as the objectives; Pareto surfaces help to quantify relationships among time, cost and quality. It is shown that cost can be reduced by increasing the duration, and quality can be improved only by increasing the cost. Originality/value: The use of different activity execution modes compiled from multiple projects in optimization is illustrated, and good compromise solutions for the multi-mode resource-constrained project scheduling problems using multi-objective optimization are identified. … (more)
- Is Part Of:
- Built environment project and asset management. Volume 9:Issue 1(2019)
- Journal:
- Built environment project and asset management
- Issue:
- Volume 9:Issue 1(2019)
- Issue Display:
- Volume 9, Issue 1 (2019)
- Year:
- 2019
- Volume:
- 9
- Issue:
- 1
- Issue Sort Value:
- 2019-0009-0001-0000
- Page Start:
- 44
- Page End:
- 63
- Publication Date:
- 2019-01-02
- Subjects:
- Multi-objective optimization -- Global optimization -- Construction quality assessment system (CONQUAS) -- Multi-criterion decision-making -- Multi-mode resource-constrained project scheduling -- Time–cost–quality
Construction industry -- Management -- Periodicals
Construction projects -- Management -- Periodicals
Public works -- Management -- Periodicals
Sustainable buildings -- Periodicals
624.068 - Journal URLs:
- http://www.emeraldinsight.com/journals.htm?issn=2044-124X ↗
http://www.emeraldinsight.com/ ↗ - DOI:
- 10.1108/BEPAM-04-2018-0075 ↗
- Languages:
- English
- ISSNs:
- 2044-124X
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 22177.xml