A reconfigurable model for implementation in the closing phase of a wind turbines project construction. Issue 2 (3rd September 2019)
- Record Type:
- Journal Article
- Title:
- A reconfigurable model for implementation in the closing phase of a wind turbines project construction. Issue 2 (3rd September 2019)
- Main Title:
- A reconfigurable model for implementation in the closing phase of a wind turbines project construction
- Authors:
- Zohrehvandi, Shakib
Vanhoucke, Mario
Soltani, Roya
Javadi, Mehrdad - Abstract:
- Abstract : Purpose: The purpose of this paper is to introduce a reconfigurable model that is a combination of a schedule model and a queuing system M/M/m/K to reduce the duration of the wind turbine construction project closure phase and reduce the project documentation waiting time in the queue. Design/methodology/approach: This research was implemented in a wind farm project. The schedule model deals with reducing the duration of the turbines closure phase by an activity overlapping technique, and the queuing system deals with reducing the turbine documentation waiting time in the queue, as well as reducing the probability of server idleness during the closure phase. Findings: After the implementation of the model, the obtained results were compared to those of similar previously conducted projects in terms of duration, and the model was found effective. Research limitations/implications: Project closure is an important and mandatory process in all projects. More often than not, this process is faced with problems including prolonged project duration, disputes, lawsuits, and also in projects like the implementation of wind farms, a queue of documents at closing stage may also cause difficulties in project closure phase. Originality/value: The contributions of this research are twofold: first, a combination of project management and queuing system is presented, and second, a reconfigurable model is introduced to enhance the performance and productivity of the closure phaseAbstract : Purpose: The purpose of this paper is to introduce a reconfigurable model that is a combination of a schedule model and a queuing system M/M/m/K to reduce the duration of the wind turbine construction project closure phase and reduce the project documentation waiting time in the queue. Design/methodology/approach: This research was implemented in a wind farm project. The schedule model deals with reducing the duration of the turbines closure phase by an activity overlapping technique, and the queuing system deals with reducing the turbine documentation waiting time in the queue, as well as reducing the probability of server idleness during the closure phase. Findings: After the implementation of the model, the obtained results were compared to those of similar previously conducted projects in terms of duration, and the model was found effective. Research limitations/implications: Project closure is an important and mandatory process in all projects. More often than not, this process is faced with problems including prolonged project duration, disputes, lawsuits, and also in projects like the implementation of wind farms, a queue of documents at closing stage may also cause difficulties in project closure phase. Originality/value: The contributions of this research are twofold: first, a combination of project management and queuing system is presented, and second, a reconfigurable model is introduced to enhance the performance and productivity of the closure phase of the project through reducing the implementation time and reducing the turbine documentation waiting time in the queue, as well as reducing the probability of server idleness during the closure phase of the wind farm project. … (more)
- Is Part Of:
- Engineering, construction and architectural management. Volume 27:Issue 2(2020)
- Journal:
- Engineering, construction and architectural management
- Issue:
- Volume 27:Issue 2(2020)
- Issue Display:
- Volume 27, Issue 2 (2020)
- Year:
- 2020
- Volume:
- 27
- Issue:
- 2
- Issue Sort Value:
- 2020-0027-0002-0000
- Page Start:
- 502
- Page End:
- 524
- Publication Date:
- 2019-09-03
- Subjects:
- Optimization -- Project management -- Construction planning -- Scheduling -- Queuing system -- Project closing -- Activities overlapping -- Reconfigurable model -- Renewable project
Construction industry -- Management -- Periodicals
Engineering -- Management -- Periodicals
Engineering -- Periodicals
Building -- Periodicals
624.068 - Journal URLs:
- http://www.emeraldinsight.com/journals.htm?issn=0969-9988 ↗
http://www.emeraldinsight.com/ ↗
http://www.blackwell-synergy.com/member/institutions/issuelist.asp?journal=eca ↗ - DOI:
- 10.1108/ECAM-01-2019-0065 ↗
- Languages:
- English
- ISSNs:
- 0969-9988
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 3758.609000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 22154.xml