An integrated approach for line balancing and AGV scheduling towards smart assembly systems. Issue 2 (3rd February 2020)
- Record Type:
- Journal Article
- Title:
- An integrated approach for line balancing and AGV scheduling towards smart assembly systems. Issue 2 (3rd February 2020)
- Main Title:
- An integrated approach for line balancing and AGV scheduling towards smart assembly systems
- Authors:
- Rahman, Humyun Fuad
Janardhanan, Mukund Nilakantan
Nielsen, Peter - Abstract:
- Abstract : Purpose: Optimizing material handling within the factory is one of the key problems of modern assembly line systems. The purpose of this paper is to focus on simultaneously balancing a robotic assembly line and the scheduling of material handling required for the operation of such a system, a topic that has received limited attention in academia. Manufacturing industries focus on full autonomy because of the rapid advancements in different elements of Industry 4.0 such as the internet of things, big data and cloud computing. In smart assembly systems, this autonomy aims at the integration of automated material handling equipment such as automated guided vehicles (AGVs) to robotic assembly line systems to ensure a reliable and flexible production system. Design/methodology/approach: This paper tackles the problem of designing a balanced robotic assembly line and the scheduling of AGVs to feed materials to these lines such that the cycle time and total tardiness of the assembly system are minimized. Because of the combination of two well-known complex problems such as line balancing and material handling and a heuristic- and metaheuristic-based integrated decision approach is proposed. Findings: A detailed computational study demonstrates how an integrated decision approach can serve as an efficient managerial tool in designing/redesigning assembly line systems and support automated transportation infrastructure. Originality/value: This study is beneficial forAbstract : Purpose: Optimizing material handling within the factory is one of the key problems of modern assembly line systems. The purpose of this paper is to focus on simultaneously balancing a robotic assembly line and the scheduling of material handling required for the operation of such a system, a topic that has received limited attention in academia. Manufacturing industries focus on full autonomy because of the rapid advancements in different elements of Industry 4.0 such as the internet of things, big data and cloud computing. In smart assembly systems, this autonomy aims at the integration of automated material handling equipment such as automated guided vehicles (AGVs) to robotic assembly line systems to ensure a reliable and flexible production system. Design/methodology/approach: This paper tackles the problem of designing a balanced robotic assembly line and the scheduling of AGVs to feed materials to these lines such that the cycle time and total tardiness of the assembly system are minimized. Because of the combination of two well-known complex problems such as line balancing and material handling and a heuristic- and metaheuristic-based integrated decision approach is proposed. Findings: A detailed computational study demonstrates how an integrated decision approach can serve as an efficient managerial tool in designing/redesigning assembly line systems and support automated transportation infrastructure. Originality/value: This study is beneficial for production managers in understanding the main decisional steps involved in the designing/redesigning of smart assembly systems and providing guidelines in decision-making. Moreover, this study explores the material distribution scheduling problems in assembly systems, which is not yet comprehensively explored in the literature. … (more)
- Is Part Of:
- Assembly automation. Volume 40:Issue 2(2020)
- Journal:
- Assembly automation
- Issue:
- Volume 40:Issue 2(2020)
- Issue Display:
- Volume 40, Issue 2 (2020)
- Year:
- 2020
- Volume:
- 40
- Issue:
- 2
- Issue Sort Value:
- 2020-0040-0002-0000
- Page Start:
- 219
- Page End:
- 234
- Publication Date:
- 2020-02-03
- Subjects:
- Heuristic -- Particle swarm optimization -- Industry 4.0 -- Automated guided vehicle scheduling -- Robotic assembly line balancing
Automation -- Periodicals
Automatic machinery -- Periodicals
Assembly-line methods -- Periodicals
Industrial engineering -- Periodicals
670.42705 - Journal URLs:
- http://www.emerald-library.com/0144-5154.htm ↗
http://www.emeraldinsight.com/journals.htm?issn=0144-5154 ↗
http://www.emeraldinsight.com/ ↗
http://firstsearch.oclc.org ↗ - DOI:
- 10.1108/AA-03-2019-0057 ↗
- Languages:
- English
- ISSNs:
- 0144-5154
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 1746.606200
British Library DSC - BLDSS-3PM
British Library STI - ELD Digital store - Ingest File:
- 22080.xml