Timing of transition from open-pit to underground mining: A simultaneous optimisation model for open-pit and underground mine production schedules. (August 2022)
- Record Type:
- Journal Article
- Title:
- Timing of transition from open-pit to underground mining: A simultaneous optimisation model for open-pit and underground mine production schedules. (August 2022)
- Main Title:
- Timing of transition from open-pit to underground mining: A simultaneous optimisation model for open-pit and underground mine production schedules
- Authors:
- Chung, Joyce
Asad, Mohammad Waqar Ali
Topal, Erkan - Abstract:
- Abstract: Generally, shallow deposits are mined through open-pit mining and where the deposits are extended to a substantial depth, there is a potential for a combination of open-pit and underground mining methods. In this case, mine planning and optimisation play a significant role in the decision-making. This paper proposes a mixed-integer programming model to obtain the optimal transition point and the transition period from open-pit to underground mining, maximizing the project net present value considering crown pillar placement and development cost. An implementing at a three-dimensional case study generates the optimal transition point and period and an optimal production schedule for both open-pit and underground operations. The implementation considers three scenarios: transition point only (scenario 1), transition point and period without production delay (scenario 2), and transition point and period with two-period production delay during the transition (scenario 3). The optimal transition point for scenario 1 is 315 m and for scenarios 2 and 3 is 360 m below the surface. Highlights: A new mixed integer programming based model for transition-point problem in mining. Simultaneous optimisation of open-pit and underground mine production schedules. Application of the model at hypothetical and realistic case studies.
- Is Part Of:
- Resources policy. Volume 77(2022)
- Journal:
- Resources policy
- Issue:
- Volume 77(2022)
- Issue Display:
- Volume 77, Issue 2022 (2022)
- Year:
- 2022
- Volume:
- 77
- Issue:
- 2022
- Issue Sort Value:
- 2022-0077-2022-0000
- Page Start:
- Page End:
- Publication Date:
- 2022-08
- Subjects:
- Open-pit to underground -- Transition point -- Mine optimisation -- Integer programming -- Production scheduling
Mines and mineral resources -- Periodicals
Ressources minérales -- Périodiques
Ressources naturelles -- Gestion -- Périodiques
Environnement -- Politique gouvernementale -- Périodiques
333.8 - Journal URLs:
- http://www.sciencedirect.com/science/journal/03014207 ↗
http://www.elsevier.com/journals ↗
http://www.journals.elsevier.com/resources-policy/ ↗ - DOI:
- 10.1016/j.resourpol.2022.102632 ↗
- Languages:
- English
- ISSNs:
- 0301-4207
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 7777.608600
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 21794.xml