Optimizing of predictive performance for construction projects utilizing support vector machine technique. Issue 1 (1st January 2019)
- Record Type:
- Journal Article
- Title:
- Optimizing of predictive performance for construction projects utilizing support vector machine technique. Issue 1 (1st January 2019)
- Main Title:
- Optimizing of predictive performance for construction projects utilizing support vector machine technique
- Authors:
- Jaber, Firas Kh.
Al-Zwainy, Faiq M. S.
Hachem, Saba W. - Editors:
- Liu, Jun
- Abstract:
- Abstract: Construction projects still face the old–new problem of delivering the projects within the predefined time and cost. This problem becomes more complicated with when addendums and variations are considered during the projects. This study aimed at developing an artificial intelligent model using support vector machine (SVM) technique to predict the time and cost indices of projects. Data from 21 tunnel projects implemented in Kurdistan, Iraq were collected and used in this study. The input data include five variables, namely contract value, contract duration, number of change orders, number of conflicts, and classification of company. WEKA––a set of software for machine learning and data mining––developed at the University of Waikato in New Zealand was used to build SVM model to predict the time and cost indices. The collected data were split by default into a training set of 65%, a testing set of 10% and a validation set of 25%. The results show that SVM model I successfully predicted the cost index not only for the trained data, but also for projects with input parameters out of the range of the training inputs. Mean Absolute Percentage Error (MAPE) and Average Accuracy (AA) for SVM prediction of cost index were found to be 13.9% and 86.1%, respectively. The SVM model II accurately predicted the time index with MAPE and AA of 3.4% and 96.6%, respectively.
- Is Part Of:
- Cogent engineering. Volume 6:Issue 1(2019)
- Journal:
- Cogent engineering
- Issue:
- Volume 6:Issue 1(2019)
- Issue Display:
- Volume 6, Issue 1 (2019)
- Year:
- 2019
- Volume:
- 6
- Issue:
- 1
- Issue Sort Value:
- 2019-0006-0001-0000
- Page Start:
- Page End:
- Publication Date:
- 2019-01-01
- Subjects:
- cost index -- time index -- tunnels projects -- mean absolute percentage errors -- average accuracy
Engineering -- Periodicals
Technology -- Periodicals
Engineering
Technology
Periodicals
620 - Journal URLs:
- http://bibpurl.oclc.org/web/73324 ↗
http://cogentoa.tandfonline.com/journal/oaen20 ↗
http://www.tandfonline.com/toc/oaen20/1/1 ↗
http://www.tandfonline.com/ ↗
http://cogentoa.tandfonline.com/journal/oaps20 ↗ - DOI:
- 10.1080/23311916.2019.1685860 ↗
- Languages:
- English
- ISSNs:
- 2331-1916
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 21721.xml