Design challenges resulting from construction of the River Dee Bridge, Aberdeen, UK. Issue 2 (21st June 2022)
- Record Type:
- Journal Article
- Title:
- Design challenges resulting from construction of the River Dee Bridge, Aberdeen, UK. Issue 2 (21st June 2022)
- Main Title:
- Design challenges resulting from construction of the River Dee Bridge, Aberdeen, UK
- Authors:
- Sandberg, Jessica
Bishop, David
Man, Louisa
Smith, David A. - Abstract:
- Abstract : This paper sets out the challenges from the perspective of the designer associated with the construction of the River Dee Bridge built by the balanced cantilever method. The importance of managing the construction sequence and its impact on both the design and programme are discussed. Monitoring and managing the loads in the temporary works were crucial to ensuring the stability of the structure. The issues associated with the temporary jacking system and the monitoring adopted are also considered.
- Is Part Of:
- Proceedings of ICE. Volume 175:Issue 2(2022)
- Journal:
- Proceedings of ICE
- Issue:
- Volume 175:Issue 2(2022)
- Issue Display:
- Volume 175, Issue 2 (2022)
- Year:
- 2022
- Volume:
- 175
- Issue:
- 2
- Issue Sort Value:
- 2022-0175-0002-0000
- Page Start:
- 84
- Page End:
- 94
- Publication Date:
- 2022-06-21
- Subjects:
- cables & tendons -- concrete structures -- temporary works
Bridges -- Design and construction -- Periodicals
Bridges -- Periodicals
624.205 - Journal URLs:
- https://www.icevirtuallibrary.com/journal/jbren ↗
- DOI:
- 10.1680/jbren.21.00022 ↗
- Languages:
- English
- ISSNs:
- 1478-4637
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library HMNTS - ELD Digital store
- Ingest File:
- 21418.xml