Use of BIM technology for optimization and virtual build of TBM tunnels. Issue 2 (11th April 2022)
- Record Type:
- Journal Article
- Title:
- Use of BIM technology for optimization and virtual build of TBM tunnels. Issue 2 (11th April 2022)
- Main Title:
- Use of BIM technology for optimization and virtual build of TBM tunnels
- Authors:
- Jeon, KiSeok
Dalton, Edward
Bakhshi, Mehdi
Nasri, Verya - Abstract:
- Abstract: The practical application of accurate design and coordination in Building Information Modeling (BIM) environment for precast rings in Tunnel Boring Machine (TBM)‐bored tunnels is becoming more achievable. These rings, made up of individual segments, are subject to many constraints which include: 1) deviations from theoretical alignment, as modeling the straight centerline of a ring into a curved alignment naturally produces minor deviations in line and grade, 2) avoiding crucifix joints when the joints between segments align in the longitudinal direction, reducing sealing performance, 3) and TBM shield design by minimizing the diameter of the TBM to reduce overcut and required backfill. This article describes the automated procedures for developing our design intent in the BIM environment with consideration for ring length optimization in tunnel curves, geometrical analyses of the staggered pattern of joints, and the minimum diameter and overcut envelope of the TBM shield. This procedure is demonstrated in multiple light‐rail transit lines in Montréal including the Réseau Express Métropolitain (REM) airport link tunnel and the expansion of the Montreal Blue Line Metro. Virtual build of these segmentally lined tunnels negotiating all straight and curved drives of the alignment with BIM modeling is realized and summarized in this article.
- Is Part Of:
- Geomechanik und Tunnelbau. Volume 15:Issue 2(2022)
- Journal:
- Geomechanik und Tunnelbau
- Issue:
- Volume 15:Issue 2(2022)
- Issue Display:
- Volume 15, Issue 2 (2022)
- Year:
- 2022
- Volume:
- 15
- Issue:
- 2
- Issue Sort Value:
- 2022-0015-0002-0000
- Page Start:
- 175
- Page End:
- 181
- Publication Date:
- 2022-04-11
- Subjects:
- BIM -- bored -- joint -- lining -- optimization -- ring -- segment -- TBM -- tunnel -- shield
Mechanized tunneling -- Innovative procedures/test techniques
Maschineller Vortrieb -- Neue Verfahren/Versuchstechnik
Engineering geology -- Periodicals
Soil mechanics -- Periodicals
Rock mechanics -- Periodicals
Tunneling -- Periodicals
624.151 - Journal URLs:
- http://onlinelibrary.wiley.com/journal/10.1002/(ISSN)1865-7389 ↗
http://www3.interscience.wiley.com/journal/117885018/home ↗
http://onlinelibrary.wiley.com/ ↗ - DOI:
- 10.1002/geot.202100078 ↗
- Languages:
- English
- ISSNs:
- 1865-7362
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 21276.xml