Cite
HARVARD Citation
Zhao, B. et al. (2022). A multi-strategy integration Pareto-based artificial colony algorithm for multi-objective flexible job shop scheduling problem with the earliness and tardiness criterion. International journal of industrial and systems engineering. pp. 182-205. [Online].