Production planning and control in multi-stage assembly systems: an assessment of Kanban, MRP, OPT (DBR) and DDMRP by simulation. Issue 3 (1st February 2022)
- Record Type:
- Journal Article
- Title:
- Production planning and control in multi-stage assembly systems: an assessment of Kanban, MRP, OPT (DBR) and DDMRP by simulation. Issue 3 (1st February 2022)
- Main Title:
- Production planning and control in multi-stage assembly systems: an assessment of Kanban, MRP, OPT (DBR) and DDMRP by simulation
- Authors:
- Thürer, Matthias
Fernandes, Nuno O.
Stevenson, Mark - Abstract:
- Abstract : Multi-stage assembly systems where the demand for components depends on the market-driven demand for end products, are commonly encountered in practice. Production Planning and Control (PPC) systems for this production context include Kanban, Materials Requirement Planning (MRP), Optimised Production Technology (OPT), and Demand Driven MRP (DDMRP). All four of these PPC systems are widely applied in practice and literature abounds on each of these systems. Yet, studies comparing these systems are scarce and remain largely inconclusive. In response, this study uses simulation to assess the performance of all four PPC systems under different levels of bottleneck severity and due date tightness. Results show that MRP performs the worst, which can be explained by the enforcement of production start dates. Meanwhile, Kanban and DDMRP perform the best if there is no bottleneck. If there is a bottleneck then DDMRP and OPT perform the best, with DDMRP realising lower inventory levels. If there is a severe bottleneck, then the performance results for DDMRP and OPT converge. This identification of contingency factors not only resolves some of the inconsistencies in the literature but also has important implications for the applicability of these four PPC systems in practice.
- Is Part Of:
- International journal of production research. Volume 60:Issue 3(2022)
- Journal:
- International journal of production research
- Issue:
- Volume 60:Issue 3(2022)
- Issue Display:
- Volume 60, Issue 3 (2022)
- Year:
- 2022
- Volume:
- 60
- Issue:
- 3
- Issue Sort Value:
- 2022-0060-0003-0000
- Page Start:
- 1036
- Page End:
- 1050
- Publication Date:
- 2022-02-01
- Subjects:
- Production control -- Kanban -- MRP -- Theory of Constraints -- demand driven material requirements planning
Factory management -- Periodicals
658.57 - Journal URLs:
- http://www.tandfonline.com/toc/tprs20/current ↗
http://www.tandfonline.com/ ↗ - DOI:
- 10.1080/00207543.2020.1849847 ↗
- Languages:
- English
- ISSNs:
- 0020-7543
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 4542.486000
British Library DSC - BLDSS-3PM
British Library STI - ELD Digital store - Ingest File:
- 20992.xml