Linear IFMIF Prototype Accelerator (LIPAc): Installation activities for Phase-B beam commissioning in Rokkasho. (May 2018)
- Record Type:
- Journal Article
- Title:
- Linear IFMIF Prototype Accelerator (LIPAc): Installation activities for Phase-B beam commissioning in Rokkasho. (May 2018)
- Main Title:
- Linear IFMIF Prototype Accelerator (LIPAc): Installation activities for Phase-B beam commissioning in Rokkasho
- Authors:
- Kondo, Keitaro
Ayala, Juan Marcos
Bolzon, Benoit
Cara, Philippe
Dzitko, Hervé
Ebisawa, Takashi
Fagotti, Enrico
Gex, Dominique
Heidinger, Roland
Hirata, Yosuke
Ichimiya, Ryo
Ikeda, Yukiharu
Jimenez, David
Jokinen, Antti
Kasugai, Atsushi
Kikuchi, Takayuki
Knaster, Juan
Komata, Masao
Maebara, Sunao
Marqueta, Alvaro
Moya, Ivan
Nishimura, Shinobu
O'hira, Shigeru
Okumura, Yoshikazu
Perez, Mario
Phillips, Guy
Podadera, Ivan
Pruneri, Giuseppe
Sakamoto, Keishi
Scantamburlo, Francesco
Shinya, Takahiro
Sugimoto, Masayoshi
Weber, Moises
… (more) - Abstract:
- Highlights: The installation of Linear IFMIF Prototype Accelerator (LIPAc) is progressing. RFQ, MEBT and beam diagnostics are in line and ready for beam commissioning. RF power system is fully commissioned, and RFQ cavity has been conditioned. Abstract: The construction of the Linear IFMIF Prototype Accelerator (LIPAc) is in progress in order to demonstrate the feasibility of the low energy section of an IFMIF deuteron accelerator up to 9 MeV with a beam current of 125 mA in CW. The next milestone of the project is the so-called Phase-B beam commissioning, and one of the missions is to demonstrate the acceleration of the proton beam up to 2.5 MeV or the deuteron beam up to 5.0 MeV in pulsed mode with a low duty cycle of 0.1% through RFQ. Most of the components and subsystems necessary for Phase-B were delivered by 2016 under the responsibility of Fusion for Energy (F4E) as in-kind contributions of several European institutes, namely CEA (France), CIEMAT (Spain), INFN (Italy), and SCK-CEN (Belgium), and QST is in charge of the installation of the delivered equipment. The installation and check-out of the RFQ subsystem and the RF power system was completed by July 2017, and the RF conditioning of the RFQ cavity started. Also, the installation and the check-out of the important sub-systems for Phase-B, namely MEBT and beam diagnostics, have been completed.
- Is Part Of:
- Nuclear materials and energy. Volume 15(2018)
- Journal:
- Nuclear materials and energy
- Issue:
- Volume 15(2018)
- Issue Display:
- Volume 15, Issue 2018 (2018)
- Year:
- 2018
- Volume:
- 15
- Issue:
- 2018
- Issue Sort Value:
- 2018-0015-2018-0000
- Page Start:
- 195
- Page End:
- 202
- Publication Date:
- 2018-05
- Subjects:
- IFMIF -- LIPAc -- RFQ -- Accelerator -- Deuteron -- Neutron source
Nuclear energy -- Periodicals
Nuclear fuels -- Periodicals
Nuclear reactors -- Materials -- Periodicals
Radioactive substances -- Periodicals
621.4833 - Journal URLs:
- http://www.sciencedirect.com/science/journal/23521791 ↗
http://www.sciencedirect.com/ ↗ - DOI:
- 10.1016/j.nme.2018.04.011 ↗
- Languages:
- English
- ISSNs:
- 2352-1791
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 20954.xml