Multi‐objective optimization for stochastic failure‐prone job shop scheduling problem via hybrid of NSGA‐II and simulation method. Issue 2 (28th July 2019)
- Record Type:
- Journal Article
- Title:
- Multi‐objective optimization for stochastic failure‐prone job shop scheduling problem via hybrid of NSGA‐II and simulation method. Issue 2 (28th July 2019)
- Main Title:
- Multi‐objective optimization for stochastic failure‐prone job shop scheduling problem via hybrid of NSGA‐II and simulation method
- Authors:
- Amelian, Sayed Shahab
Sajadi, Seyed Mojtaba
Navabakhsh, Mehrzad
Esmaelian, Majid - Other Names:
- Wu Desheng Dash guestEditor.
Hall Jon guestEditor.
Belezamo Baloka guestEditor.
Eken Süleyman guestEditor.
Avci Cafer guestEditor. - Abstract:
- Abstract: Production scheduling and reliability of machinery are prominent issues in flexible manufacturing systems that are led to decreasing of production costs and increasing of system efficiency. In this paper, multiobjective optimization of stochastic failure‐prone job shop scheduling problem is sought wherein that job processing time seems to be controllable. It endeavours to determine the best sequence of jobs, optimal production rate, and optimum preventive maintenance period for simultaneous optimization of three criteria of sum of earliness and tardiness, system reliability, and energy consumption. First, a new mixed integer programming model is proposed to formulate the problem. Then, by combining of simulation and NSGA‐II algorithm, a new algorithm is put forward for solving the problem. A set of Pareto optimal solutions is achieved through this algorithm. The stochastic failure‐prone job shop with controllable processing times has not been investigated in the earlier research, and for the first time, a new hedging point policy is presented. The computational results reveal that the proposed metaheuristic algorithm converges into optimal or near‐optimal solution. To end, results and managerial insights for the problem are presented.
- Is Part Of:
- Expert systems. Volume 39:Issue 2(2022)
- Journal:
- Expert systems
- Issue:
- Volume 39:Issue 2(2022)
- Issue Display:
- Volume 39, Issue 2 (2022)
- Year:
- 2022
- Volume:
- 39
- Issue:
- 2
- Issue Sort Value:
- 2022-0039-0002-0000
- Page Start:
- n/a
- Page End:
- n/a
- Publication Date:
- 2019-07-28
- Subjects:
- controllable processing times -- failure‐prone manufacturing system -- modified hedging point policy -- Pareto optimal solutions -- stochastic job shop scheduling
Expert systems (Computer science)
006.33 - Journal URLs:
- http://onlinelibrary.wiley.com/journal/10.1111/(ISSN)1468-0394 ↗
http://onlinelibrary.wiley.com/ ↗ - DOI:
- 10.1111/exsy.12455 ↗
- Languages:
- English
- ISSNs:
- 0266-4720
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 3842.004000
British Library DSC - BLDSS-3PM
British Library STI - ELD Digital store - Ingest File:
- 20776.xml