First results of the new endcap TOF commissioning at BESIII. (8th July 2016)
- Record Type:
- Journal Article
- Title:
- First results of the new endcap TOF commissioning at BESIII. (8th July 2016)
- Main Title:
- First results of the new endcap TOF commissioning at BESIII
- Authors:
- Wu, Z.
Sun, S.
Heng, Y.
Wang, X.
Sun, Y.
Li, C.
Liu, Z.
Dai, H.
Zhang, J.
Cao, P.
Sun, W.
Wang, S.
Wang, Y.
Ji, X.
Zhao, J.
Gong, W.
Chen, M.
Ye, M.
Qiu, Y.
Ma, X.
Xu, M.
Luo, X.
Li, J.
Yang, R.
An, F.
An, Q.
Jiang, X.
Liu, Zhen-an
Liu, S.
Zhu, K. - Abstract:
- Abstract: The upgrade of the current BESIII Endcap TOF (ETOF) is carried out with Multi-gap Resistive Plate Chamber (MRPC) technology. The installation of the new ETOF has been finished in October 2015. The first results of the MRPCs commissioning at BESIII are reported in this paper.
- Is Part Of:
- Journal of instrumentation. Volume 11:Number 7(2016:Jul.)
- Journal:
- Journal of instrumentation
- Issue:
- Volume 11:Number 7(2016:Jul.)
- Issue Display:
- Volume 11, Issue 7 (2016)
- Year:
- 2016
- Volume:
- 11
- Issue:
- 7
- Issue Sort Value:
- 2016-0011-0007-0000
- Page Start:
- C07005
- Page End:
- C07005
- Publication Date:
- 2016-07-08
- Subjects:
- Instrumentation and methods for time-of-flight (TOF) spectroscopy -- Spectrometers
Scientific apparatus and instruments -- Periodicals
502.84 - Journal URLs:
- http://iopscience.iop.org/1748-0221 ↗
http://ioppublishing.org/ ↗ - DOI:
- 10.1088/1748-0221/11/07/C07005 ↗
- Languages:
- English
- ISSNs:
- 1748-0221
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 20661.xml