Cite
HARVARD Citation
Melaku Belay, S. et al. (2021). Analysis of Cost Overrun and Schedule Delays of Infrastructure Projects in Low Income Economies: Case Studies in Ethiopia. Advances in civil engineering. p. . [Online].
This is an interim version of our Electronic Legal Deposit Catalogue-eJournals and eBooks while we continue to recover from a cyber-attack.
Melaku Belay, S. et al. (2021). Analysis of Cost Overrun and Schedule Delays of Infrastructure Projects in Low Income Economies: Case Studies in Ethiopia. Advances in civil engineering. p. . [Online].