A two-stage hybrid robust-stochastic day-ahead scheduling of transactive microgrids considering the possibility of main grid disconnection. (March 2022)
- Record Type:
- Journal Article
- Title:
- A two-stage hybrid robust-stochastic day-ahead scheduling of transactive microgrids considering the possibility of main grid disconnection. (March 2022)
- Main Title:
- A two-stage hybrid robust-stochastic day-ahead scheduling of transactive microgrids considering the possibility of main grid disconnection
- Authors:
- Nourollahi, Ramin
Salyani, Pouya
Zare, Kazem
Razzaghi, Reza - Abstract:
- Highlights: Interconnected transactive MGs (ITMGs) and their day-ahead scheduling is discussed. The resilient operation is considered during the main grid disconnections. A two-stage MILP model is introduced to solve in Robust-stochastic framework. Both the 24-hour operational cost and resilient operation of the ITMG are studied. Emergency demand response program and its trigger condition is discussed. Abstract: The interconnected transactive MGs (ITMGs) concept is an efficient way for economical operation of MGs. For power systems under the danger of stochastic disasters, a priority should be given to the resiliency enhancement of these ITMGs to have the highest restoration in the times of disconnection from the main grid. This paper introduces a two-stage hybrid stochastic programming/robust optimization (SP/RO) day-ahead scheduling of ITMGs that takes into account the possibility of disconnection from the main grid for several hours. The proposed resiliency-oriented scheduling in this paper is a two-stage mixed-integer linear optimization problem and aims to reduce the operation cost of the whole ITMG. Furthermore, the excess power can be traded among MGs apart from the available power of renewable resources, dispatched power of storage and dispatchable units, and demand response programs. Thus, this scheduling needs to consider the optimal hourly transactive energy among the MGs in both normal and grid disconnected modes of the ITMG. The load curtailment and demandHighlights: Interconnected transactive MGs (ITMGs) and their day-ahead scheduling is discussed. The resilient operation is considered during the main grid disconnections. A two-stage MILP model is introduced to solve in Robust-stochastic framework. Both the 24-hour operational cost and resilient operation of the ITMG are studied. Emergency demand response program and its trigger condition is discussed. Abstract: The interconnected transactive MGs (ITMGs) concept is an efficient way for economical operation of MGs. For power systems under the danger of stochastic disasters, a priority should be given to the resiliency enhancement of these ITMGs to have the highest restoration in the times of disconnection from the main grid. This paper introduces a two-stage hybrid stochastic programming/robust optimization (SP/RO) day-ahead scheduling of ITMGs that takes into account the possibility of disconnection from the main grid for several hours. The proposed resiliency-oriented scheduling in this paper is a two-stage mixed-integer linear optimization problem and aims to reduce the operation cost of the whole ITMG. Furthermore, the excess power can be traded among MGs apart from the available power of renewable resources, dispatched power of storage and dispatchable units, and demand response programs. Thus, this scheduling needs to consider the optimal hourly transactive energy among the MGs in both normal and grid disconnected modes of the ITMG. The load curtailment and demand response programs are the last options for maintaining the balance in the conventional structure of MGs that this paper utilizes for ITMG. Obtained results showed that load curtailment of the ITMG is limited by the implementation of transactive energy between MGs. Furthermore, the reduction in renewable and dispatchable generation capacity and their impact on transactive energy and demand response programs during resiliency is discussed. Also, to enhance the conservativeness and to consider the worst cases in this scheduling, the uncertainties in the start time of the islanding and its duration are considered in the problem. … (more)
- Is Part Of:
- International journal of electrical power & energy systems. Volume 136(2022)
- Journal:
- International journal of electrical power & energy systems
- Issue:
- Volume 136(2022)
- Issue Display:
- Volume 136, Issue 2022 (2022)
- Year:
- 2022
- Volume:
- 136
- Issue:
- 2022
- Issue Sort Value:
- 2022-0136-2022-0000
- Page Start:
- Page End:
- Publication Date:
- 2022-03
- Subjects:
- MG -- Resiliency -- Robust-stochastic -- ITMG -- Interconnected transactive MGs
Electrical engineering -- Periodicals
Electric power systems -- Periodicals
Électrotechnique -- Périodiques
Réseaux électriques (Énergie) -- Périodiques
Electric power systems
Electrical engineering
Periodicals
621.3 - Journal URLs:
- http://www.sciencedirect.com/science/journal/01420615 ↗
http://www.elsevier.com/journals ↗ - DOI:
- 10.1016/j.ijepes.2021.107701 ↗
- Languages:
- English
- ISSNs:
- 0142-0615
- Deposit Type:
- Legaldeposit
- View Content:
- Available online (eLD content is only available in our Reading Rooms) ↗
- Physical Locations:
- British Library DSC - 4542.220000
British Library DSC - BLDSS-3PM
British Library HMNTS - ELD Digital store - Ingest File:
- 20110.xml